Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 4 9/17/2009
the appropriate requirement of the certification or operating regulation should be
included.
(i) General. Include all descriptive information necessary to identify the
configuration and conditions for which the performance data are applicable. Such
information may include the complete model designations of rotorcraft and engines,
definition of installed rotorcraft features, and equipment that affects performance
together with the operative status thereof. This section should also include definitions
or terms used in the performance section (i.e., indicated airspeed (IAS), calibrated
airspeed (CAS), international standard atmosphere (ISA), configuration, etc.) plus
calibration data for airspeed, altimeter, ambient air temperature, and other information
of a general nature.
(ii) Performance Procedures. The procedures, techniques, and other
conditions associated with obtainment of the flight manual performance should be
included. The procedures may be presented as a performance subsection or in
connection with a particular performance graph. In the latter case, a comprehensive
listing of the conditions associated with the particular performance may serve the
objective of "procedures" if sufficiently complete. Performance figures are based on the
minimum installed specification engine.
(iii) Wind Accountability. Wind accountability may be utilized for determining
takeoff and landing field lengths. This accountability may be up to 100 percent of the
minimum wind component along the takeoff or landing path opposite to the direction of
takeoff. Wind accountability data presented in the RFM should be labeled
"UNFACTORED" (if 100 percent accountability is taken) and should be accompanied by
the following note: "Unless otherwise authorized by operating regulations, the pilot is
not authorized to credit more than 50 percent of the performance increase resulting
from the actual headwind component and must reduce performance by 150 percent of
the performance decrement resulting from the actual tail wind component." In some
rotorcraft, it may be necessary to discount the beneficial aid to takeoff performance for
winds from zero to 10 knots. This should be done if it is evident that the winds from
zero to 10 knots have resulted in a significant degradation to the takeoff performance
due to flight through the main rotor vortex. Degradation may be determined by
ascertaining the power required to fly, by reference to a calibrated pace vehicle, at
speeds of 10 knots or less.
(iv) The following list is illustrative of the information that may be provided
for a normal category helicopter.
(A) Density altitude chart for converting from pressure to density altitude.
(B) Airspeed calibration (calibrated vs. true indicated airspeed) for level
flight.
Page G – 47.1
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.