Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
9/30/99 AC 27-1B
(ii) Test Procedures.
(A) Single-Engine Procedure.
(1) The cooling test is to be conducted during ground operation,
climb-out, cruise, approach, and hover flight regimes.
(2) All ground operational and in-ground-effect hover tests should be
conducted in ambient winds of 5 knots or less.
(3) The battery may be connected to the bus during the
generator/alternator cooling test. The generator/alternator temperatures should be
recorded at intervals sufficiently close to show the rate of temperature increase and
stabilization. The temperature may be considered stabilized when it peaks and has not
increased in the last 5 minutes. The climb-out speed and power setting should
correspond to the best rate of climb speed, using maximum continuous power or any
other normal conditions of climb that would cause the generator/alternator temperatures
to be critical. The cruise test should be conducted at maximum altitude in the cruise
configuration. Generator/alternator cooling should be conducted at rated output
consistent with the RPM at which it is operating. For instance, during the ground tests
the engine RPM may be lower than that necessary to sustain maximum rated amperage
output. In this case the maximum amperage output of the generator/alternator
corresponding to the lower RPM should be assured.
(4) The test sequence should begin with about 30 minutes of ground
operation to account for taxi and holding times and end 5 minutes after all temperatures
have peaked after engine shutdown.
(B) Multiengine Procedures. Conduct a generator cooling test in
accordance with the following procedures:
(1) All ground operational and in-ground-effect hover tests should be
conducted in ambient winds of 5 knots or less.
(2) After engine start, load the instrumented generator to its proposed
amperage limit and begin recording temperatures.
(3) A total of 30 minutes should be spent on the ground prior to takeoff.
This is to account for taxi and holding times.
(4) After takeoff, climb at single-engine, best-rate-of-climb speed using
maximum continuous power, to the single-engine service ceiling. Above this, continue
at twin-engine, best-rate-of-climb speed, using maximum continuous power on both
engines, to maximum altitude.
Page F - 57
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.