FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page F-57

PDF page 653 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 653
AC 27-1B · F-57Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

9/30/99                                             AC 27-1B

                   (ii)   Test Procedures.

              (A) Single-Engine Procedure.

               (1) The cooling test is to be conducted during ground operation,
climb-out, cruise, approach, and hover flight regimes.

               (2)  All ground operational and in-ground-effect hover tests should be
conducted in ambient winds of 5 knots or less.

               (3) The battery may be connected to the bus during the
generator/alternator cooling test. The generator/alternator temperatures should be
recorded at intervals sufficiently close to show the rate of temperature increase and
stabilization. The temperature may be considered stabilized when it peaks and has not
increased in the last 5 minutes. The climb-out speed and power setting should
correspond to the best rate of climb speed, using maximum continuous power or any
other normal conditions of climb that would cause the generator/alternator temperatures
to be critical. The cruise test should be conducted at maximum altitude in the cruise
configuration. Generator/alternator cooling should be conducted at rated output
consistent with the RPM at which it is operating. For instance, during the ground tests
the engine RPM may be lower than that necessary to sustain maximum rated amperage
output. In this case the maximum amperage output of the generator/alternator
corresponding to the lower RPM should be assured.

               (4) The test sequence should begin with about 30 minutes of ground
operation to account for taxi and holding times and end 5 minutes after all temperatures
have peaked after engine shutdown.

              (B) Multiengine Procedures. Conduct a generator cooling test in
accordance with the following procedures:

               (1)  All ground operational and in-ground-effect hover tests should be
conducted in ambient winds of 5 knots or less.

               (2)  After engine start, load the instrumented generator to its proposed
amperage limit and begin recording temperatures.

               (3) A total of 30 minutes should be spent on the ground prior to takeoff.
This is to account for taxi and holding times.

               (4)  After takeoff, climb at single-engine, best-rate-of-climb speed using
maximum continuous power, to the single-engine service ceiling. Above this, continue
at twin-engine, best-rate-of-climb speed, using maximum continuous power on both
engines, to maximum altitude.




                                                       Page F - 57

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →