FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page F-40

PDF page 627 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 627
AC 27-1B · F-40Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B                                                                  9/30/99

performance standards for pitot tubes, and pitot tubes qualified to this TSO normally
allow for a satisfactory aircraft installation.

         (5) The calibration requirements of the standard seem to be self-explanatory
and are not discussed further in this paragraph.

AC 27.1325. § 27.1325 (Amendment 27-13) STATIC PRESSURE SYSTEMS.

     a. Explanation.

         (1) This section, in conjunction with § 27.1323, provides minimum performance
standards for static pressure systems. The standard provides some relief when
considering the icing environmental condition in that it allows the use of an alternate
static port to account for the icing condition.

         (2) The standard for the consideration of environmental conditions is
§ 27.1309(a).

         (3) The standard for consideration of malfunction conditions is § 27.1309(b).

         (4) For rotorcraft that will be approved for IFR operation, the provisions of
Appendix B VIII(b)(5) of Part 27 as discussed in paragraph AC 27 Appendix B should
also be considered.

     b. Procedures. The installation of the static system should consider the following:

         (1) Static lines should be initially routed upward immediately behind the static
pressure port. This procedure will minimize the entry of moisture into the system when
operating in rain or washing the rotorcraft.

         (2) Drain(s) should be located at low points in the system. Line routing and
clamping should allow for all moisture that does enter the system to be routed to the
drain(s).

         (3) If independent systems are provided, the placement of each system
component should allow for maximum practicable separation of each system. As much
as possible, one system should be on one side of the rotorcraft and the second system
on the opposite side.

         (4) Most static pressure ports that are provided for IFR operation are heated.
Before any tests are conducted, a program to qualify the heater on the port should
normally be agreed upon through discussions between the FAA and the applicant.  It is
suggested that the requirements of TSO C16, Airspeed Tubes (Heated), be used as a
guide for these discussions.  If the ports are not to be heated, a comprehensive analysis
should be prepared, and limited testing should be conducted to verify the analysis.



Page F - 40

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →