Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 4 3/31/2014
AC 27.29. § 27.29 (Amendment 27-14) EMPTY WEIGHT AND CORRESPONDING
CENTER OF GRAVITY.
a. Explanation. The empty weight of the rotorcraft consists of the airframe,
engines, and all items of operating equipment that have fixed locations and are
permanently installed (including both required and optional equipment) in the rotorcraft.
It includes fixed ballast, unusable fuel, other unusable fluids, and full operating fluids.
“Full operating fluids” such as oils used in an engine, auxiliary power unit, main and
auxiliary gearboxes, and hydraulic systems are considered “closed fluid systems”
typically filled to a “full mark” indicator level. Fluids necessary for the operation of non-
permanently installed equipment (i.e., carry-on equipment) are not considered part of
the empty weight.
(1) A ballast is fixed when made a permanent part of the rotorcraft as a means
of controlling the empty weight center of gravity (CG).
(2) Installed equipment is any FAA-approved equipment attached to the
rotorcraft with hardware and, as a result, becomes an integral part of the rotorcraft. The
installation or removal of such equipment must be recorded in the aircraft equipment
list. Compliance with paragraph (b) of § 27.29 is accomplished by the use of an
equipment list specifying the installed equipment at the time of weighing and the weight
arm and moment of the equipment.
b. Procedures.
(1) Determination of the empty weight and corresponding center of gravity is
primarily the responsibility of the manufacturer and is normally made on a production
rotorcraft rather than a prototype. If the manufacturer has been issued a production
certificate and wishes to avoid weighing each production rotorcraft, the manufacturer
may make a detailed proposal defining the procedures it would use to establish an
empty weight and CG. When the proposal is approved, the manufacturer will weigh the
first five to ten production rotorcraft and show that the rotorcraft will be within ±1 percent
on empty weight and ±0.2 inches on CG. After this procedure is established, the empty
weight and CG may be computed except that at regular intervals a rotorcraft will be
weighed to ensure the tolerances are still being maintained (e.g., one in ten rotorcraft)
(2) For prototype and modified rotorcraft, it is only necessary to establish a
known basic weight and CG position (by weighing) from which the extremes of weight
and CG travel required by the test program may be calculated. See FAA-H-8083-1
(Pilots Weight and Balance Handbook) for a sample weight and balance procedure.
(3) The weight and balance should be recalculated if a modification (or series of
modifications) to the rotorcraft results in a significant change to the empty weight.
Additionally, this change in empty weight should be reflected with the weight and
balance information contained in the Rotorcraft Flight Manual (RFM) or Rotorcraft Flight
Manual Supplement (RFMS).
Page B – 6
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.