This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page D-41

PDF page 312 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 312
AC 27-1B · D-41Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

4/25/06                                        AC 27-1B, Chg 2

AC 27.683.  § 27.683 OPERATION TESTS.

     a. Explanation. The rule requires that the control system be free from jamming,
excessive friction, and excessive deflection. An operational test is required in which
specified loads are applied at the pilot controls and carried through an operating control
system.

     b. Procedures.

         (1) Compliance with the requirements of this rule is obtained by use of a test
setup similar to that used for the limit load tests of § 27.681, except the load reactions at
the blades (or surfaces) must allow for movement of the blades (or surfaces) as the
system is operated through its operating range.

         (2) Fixtures are normally affixed to the surfaces (or replace the surfaces) to
allow pulley arrangements which provide for movement under load. These fixtures
should be evaluated to ensure that system loads up to limit will be applied during the full
range of operations of each system.

         (3) Each flight control system should be operated through its entire range under
a light load and under limit load. As the controls are being operated, the system should
be checked for jamming, excessive friction, and excessive deflection. Excessive
deflection includes deflection sufficient to contact other systems or structure. Also, if
under these limit load conditions the components deflect, the deflection would be
considered excessive if there is permanent deformation of any component or supporting
structure. Also any deflection that results in an uncorrected condition when the load is
released, e.g., if a bellcrank is forced off-center or over-center during load and does not
return to the normal position after load release is excessive deflection. Floor panels,
wall panels, and other access panels may have to be removed to permit visual checks
of the entire control system.

AC 27.685.  § 27.685 (Amendment 27-11) CONTROL SYSTEM DETAILS.

     a. Explanation. The rule requires that the control system be designed to prevent
chafing, jamming, and interference from cargo, passengers, loose objects, or the
freezing of moisture. Specifically, means are required in the cockpit to prevent the entry
of foreign objects into places where they would jam the system, and means are required
to prevent the slapping of cables or tubes against other parts.

     b. Procedures.

         (1) The geometry of the control system components and their installations are
the primary control to prevent chafing, jamming, and interference. The control system
from cockpit to surface should be checked for clearances both unloaded and loaded.
The control system should be checked under load during both the limit load static tests
(reference § 27.681) and the operational tests of § 27.683. Location of guides or


                                                       Page D - 41

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →