FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page D-12

PDF page 281 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 281
AC 27-1B · D-12Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, Chg 4                                                     3/31/2014


AC 27.611.  § 27.611 INSPECTION PROVISIONS.

     a. Explanation. The rotorcraft must have access panels or openings that will
allow for proper maintenance and/or adjustment of the rotorcraft systems.

         (1) The rule states: “There must be means to allow close examination of each
part that requires recurring inspection, adjustment for proper alignment and functioning,
or lubrication.”

         (2) “Structural” or load-carrying access panels may be used to comply with the
rule. Structural panels should have stencils or permanent labels (§ 27.1541(a)(2))
stating the panels must be installed prior to ground or flight operation.

         (3) Holes or “nonstructural” access panels should be used whenever possible.

     b. Procedures.

         (1) The determination of compliance can be accomplished in conjunction with
the following activities:

                  (i)   Reviewing type design drawings.

                   (ii)   Conformity inspections accomplished during certification testing.

                    (iii)  Be evaluated during the control system proof and operation tests
(§§ 27.681 and 27.683).

               (iv)  During type inspection tests and functioning and reliability testing.

         (2) Equipment requiring frequent inspections (at less than 25-hour intervals),
lubrication, or adjustments should be accessible through “nonstructural” doors. Areas
or items requiring daily attention should be accessible through “nonstructural” doors
since properly rated maintenance personnel are required to “open and close” or reinstall
structural panels, and special design features, such as multiple pins and latches, are
generally necessary for structural doors.





Page D - 12

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →