FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page C-81

PDF page 231 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 231
AC 27-1B · C-81Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

9/30/99                                             AC 27-1B

AC 27.563  § 27.563 (Amendment 27-11) STRUCTURAL DITCHING PROVISIONS.

     a. Explanation. Amendment 27-11 included certification requirements for ditching
approvals. The rotorcraft must be able to sustain an emergency landing in water as
prescribed by § 27.801(e).

     b. Procedures. Refer to paragraph AC 27.801 for procedures.

AC 27.563A    § 27.563(Amendment 27-26) STRUCTURAL DITCHING
             PROVISIONS.

     a. Explanation. Amendment 27-26 added specific structural conditions to be
considered to support the overall ditching requirements of § 27.801. These conditions
are to be applied to rotorcraft for which over-water operations and associated ditching
approvals are requested.

         (1) The forward speed landing conditions are specified as:

                  (i)   The rotorcraft should contact the most critical wave for probable water
conditions, in the likely pitch, roll, and yaw attitudes.

                   (ii)   The forward velocity relative to wave surface should be in a range of 0
to 30 knots with a vertical descent rate of not less than 5 FPS relative to the mean water
surface.

NOTE: A forward velocity of less than 30 knots may be used for multiengine rotorcraft
if it can be demonstrated that the forward velocity selected would not be exceeded in a
normal one-engine-out touchdown.

                    (iii)   Rotor lift of not more than two-thirds of the design maximum weight
may be used to act through the CG throughout the landing impact.

         (2) For floats fixed or deployed before water contact, the auxiliary or emergency
float conditions are specified in § 27.563(b)(1). Loads for a fully immersed float should
be applied (unless it is shown that full immersion is unlikely).  If full immersion is
unlikely, loads resulting from restoring moments are specified for sidewind and
unsymmetrical rotorcraft landing.

         (3) Floats deployed after water contact are normally considered fully immersed
during and after full inflation. An exception would be when the inflation interval is long
enough that full immersion of the inflated floats does not occur; e.g., deceleration of the
rotorcraft during water impact and natural buoyancy of the hull prevent full immersion
loads on the fully inflated floats.

     b. Procedures.



                                                          Page C - 81

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →