FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page C-6

PDF page 156 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 156
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, AC 27-1B, Chg 4                                             3/31/2014


         (1) The applicant may elect to substantiate the rotorcraft for a design
maneuvering load factor less than +3.5 and more than -1.0. Whenever this option is
used, an analytical study and flight demonstration are required.

                  (i)   The maximum positive design load factor of +3.5 is generally at a
weight below maximum gross weight. The maximum thrust capability of the main rotor,
combined with incremental lift of wings or sponsons, if installed, results in a maximum
design positive load factor. An example of a load factor-gross weight curve is shown in
figure AC 27.337-1. Note the minimum positive design load factor is +2.0 even though
the required analysis and flight demonstration may prove the rotorcraft is not capable of
achieving this load factor. This curve also illustrates compliance with § 27.321(b)(1)
since the design load factor varies with gross weight.

                   (ii)   The largest negative design load factor is -1.0; however, several
current rotorcraft designs are not capable of achieving a negative load factor.
Therefore, -0.5 has been an acceptable structural design negative load factor for certain
rotorcraft designs.

         (2) Whenever the applicant analytically substantiates the lower load factors
allowed by § 27.337(b), the flight demonstration required by § 27.337(b) must be
conducted. The flight test personnel should determine that the demonstration shows
the probability of exceeding the selected design load factors (those factors less than
+3.5 and more than -1.0) is extremely remote.

         (3) A numerical value has not been assigned to “extremely remote” in this
standard.





Page C - 6

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗