Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
9/30/99 AC 27-1B
speeds, VNE and VD speeds, and weight and CG position. An illustration of the speed
and RPM demonstration is shown in figure AC 27.251-1. (Also see paragraph
AC 27.251b(4).)
(3) The airspeed and rotor speed limits investigated and established under
§§ 27.33, 27.1503, 27.1505, and 27.1509 are also investigated and made a matter of
record in the flight loads survey data. During the official FAA/AUTHORITY/TIA flight
tests, critical parts of the rotorcraft may have limited instrumentation to reinvestigate and
confirm that the critical conditions investigated during the flight load survey are
satisfactory and do not result in excessive vibration. Use of instrumentation is optional if
the flight loads data are conclusive.
(4) FAA/AUTHORITY policy for certification (Review Case No. 70) requires a
“rotor roughness” flight demonstration of a 30° bank angle left and right at maximum
continuous power (MCP) (maximum continuous torque which may be in excess of the
maximum continuous temperature limit) at VNE. To provide the pilot with some margin
from roughness, the FAA/AUTHORITY requires maneuver demonstrations of 30°
banked turns at VNE without encountering excessive roughness. The maneuver should
be conducted with the rotor speed at the minimum RPM and maximum RPM limits.
During the flight load survey, this condition should be investigated and data recorded to
ensure hazardous loads are not encountered for this “unusual” condition. As indicated,
the flight condition will be reinvestigated during the FAA/AUTHORITY flight tests. See
paragraph AC 27.251b(2) for illustration of this speed and RPM demonstration.
Page B - 69
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.