FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 1090

PDF page 1090 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 1090
AC 27-1B · 1090Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/4/2016                                                            AC 27-1B, Chg 7

 Note: Not all ATA chapters or subchapters have been included. Also, the italicized entries are not usually included in the
                       failure condition description but in the systems description or assumptions section.

ATA 73-00-00 - ENGINE FUEL AND CONTROL
                        Failure      Phase of      Effect of the Failure     Classification  Notes          Supporting   Verification        Function ATA                 Condition   Operation    on the Aircraft, Crew    of the FC      (assumptions)  Material    Method        Description                     (FC)                   and Occupants
                        Misleading     ALL        If the indication to the                                                  Analysis
                           fuel                             pilot is a warning, the
                          pressure                       likely requirement is to
                            indication.                  land immediately.
                                               Worst case is ditching
                                                           in poor conditions
                                                    causing a large
                                                       reduction in safety
                                                  margins or functional
                                                              capabilities.





                              Figure AC 27 MG 21-1. Generic Examples by ATA.

                                                                               Page MG 21 - 39

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →