FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

PDF page 1053

PDF page 1053 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 1053
AC 27-1B · 1053Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

AC 27-1B, Chg 7                                                       2/4/2014


               (i) RTCA Document DO-178C, Software Considerations in Airborne Systems
and Equipment Certification, dated December 13, 2011.

                (ii) RTCA Document DO-254, Design Assurance Guidance for Airborne
Electronic Hardware, dated April 19, 2000.

                 (iii) RTCA Document DO-297, Integrated Modular Avionics (IMA)
Development Guidance and Certification Considerations, dated November 8, 2005.

    c. Background. The FAA recognizes the importance of timely completion of an FHA
to minimize TC, amended TC, STC, amended STC, and TSOA project delays and
potential risks of redesigns required late in a project because of information obtained
from the completed FHA. Applicants are expected to not only properly complete FHAs
as early as possible to minimize the risks described above, but also obtain FAA
acceptance of the FHAs.

    d. When to create an FHA. The FAA expects a discussion of the FHA take place
during the very early stages of the TC, amended TC, STC, amended STC project (i.e.,
during the Familiarization Briefing). This will provide the FAA with the necessary design
safety aspects information while the development is still in the conceptual and
requirements definition phases. Since the FHA process is designed to provide the
system level safety and derived requirements, it is imperative that the applicant obtain
FAA acceptance of the FHA as early as possible in the systems development (i.e., prior
to submitting the certification plan). This will minimize the risk of the applicant’s design
requiring changes late in the program to satisfy safety requirements obtained from the
completed FHA.

    e. How to create an FHA.

       (1) The process to create an FHA can be considered fairly complicated if doing it
for the first time. This guidance presumes that an applicant is familiar with ARP 4761
and is looking for some additional guidance in recognizing some of the likely functions
of each system and the associated failure conditions (FC) that should be reflected in a
FHA. The table in Figure AC 27 MG 21-1 provides a snapshot of considerations an
applicant should address when examining their design for a systematic safety review.
This table not a complete list nor are the FCs listed in the figure applicable for all
designs.

       (2) One additional item is the need to include a complete list of assumptions
made when developing the FHA. These assumptions may include the intended aircraft
(single or dual engine, existing certificated interfacing equipment), type of operation
(e.g., IFR, VFR, category A), crew composition (e.g., single pilot, dual pilot), etc. These
should be listed in the front of the document prior to the functional failure conditions
matrix.



Page MG 21 - 2

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →