AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(1) Test Environment. The environment for bench tests includes:
(i) AdFC system should be realistic to the aircraft environment, including, but not limited to, the mechanical equipment, wiring, cooling, electrical and hydraulic power supplies, cockpit controls and displays, trim system, actuation system, and actuator loads.
(ii) If simulation is used, the model must be validated by a means acceptable to the FAA.
(2) Test Procedure and Expected Results. The test procedures for bench tests and rig tests should include open loop and closed-loop tests with simulated failures. The expected results are:
(i) Verification of failure logic, failure management, and resultant degraded modes.
(ii) Evaluation of transients during and after failure modes.
Note: Compared to validation of failure management in the simulator, the use of hardware-in-the-loop simulation provides more realistic results with respect to signal accuracy and resolution, phase delay, and other hardware or software related effects.
(D) Rotorcraft Test.
(1) Ground Test. Verification of some aspects of the AdFC functionality should be possible on the ground, such as determination of stuck or jammed controls or actuators. Ground testing should be performed to check the safety functions with the equipment installed in the aircraft. Operation tests should demonstrate that the flight control system is free from jamming. Limit load static tests should demonstrate compliance with limit load requirements.
(2) Flight Test. The objective of flight tests is to show compliance with applicable rules and safety requirements, and to verify assumptions for those objectives that are not possible during ground testing. Certain effects can only be addressed in flight, such as aircraft stability and control, aircrew human factors and ergonomics, pilot- induced oscillations, air resonance, and structural coupling. Rotorcraft performance and handling qualities under normal and failure operating conditions should be assessed. If necessary, testing conditions should provide for resetting of failures at any time to return to the faultless system configuration. Flight tests at various flight conditions with and without simulated failures should be performed considering event risk assessments and risk mitigations.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source