Scope, source and reading notes

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

Source page 975 · PDF page 975

(iv) The FAA will review the data package to verify compliance. After certification package acceptance, the applicant should coordinate the FAA ground and flight test plan and test schedule. The test plan and schedule should include all proposed tests to show compliance. RTCA Document DO-275, section 4.0, and its appendices describe one acceptable method of demonstrating compliance. The checklists found at http://www.faa.gov/aircraft/air_cert/design_approvals/rotorcraft/nvis/ also outline another acceptable test sequence. Upon test plan acceptance, prior to commencing any certification tests (ground or flight), a conformity inspection should be performed. Once the conformity is completed, any changes from the conformed configuration (e.g., removing filters or changing bulbs in light sources) may require another conformity inspection at the discretion of the certification office.

(v) The applicant is responsible for meeting all pre-test requirements and providing the FAA certification office with the following:

(A) A list of test equipment the applicant will use (i.e., tri-bar charts, illumination source, illumination measuring device, NVG test set, or NVG eye lane).

(B) A description of the test facilities to be used (type of darkened location).

(C) A description of the proposed flight area including cultural lighting, terrain, obstacles, and landing areas.

(D) Weather and illumination information including moon cycle, anticipated climatic conditions, etc.

(E) Any additional training necessary to operate in a NVIS environment (novel or new technology briefing).

(F) The flight equipment to be used (helmets, mounts, NVGs, flashlights, etc.).

(vi) Ground Test Procedures.

(A) Conducting ground testing prior to flight testing will optimize the test program and minimize flight test risks. Conduct this evaluation from all crew stations intended to be used (including the cabin) in NVG operations. The power supply used for ground tests, with the aircraft electrical generating system not operating, should provide power representative of flight conditions. Consider using power representative of flight conditions with generator and battery power to assess how the lighting system functions on low power.

(B) Flight-testing should be commenced after satisfactory completion of ground testing. The schedule should allow for sufficient time between ground and flight test to resolve deficiencies discovered during ground testing. RTCA Document DO-275, section 4.4.1 and its appendices provide one acceptable test procedure and test sequence. Alternatively, as a minimum, complete the FAA Ground NVG-Cockpit Compatibility checklist, found at http://www.faa.gov/aircraft/air_cert/design_approvals/rotorcraft/nvis.

-

(vii) Flight test procedures.

(A) Flight test should be scheduled for a low illumination (no moon) night, preferably in an area where there is little cultural lighting. Evaluation of NVG and NVIS lighting integration should be conducted in low ambient light conditions, because high ambient lighting conditions may mask the effects of inadequate cockpit lighting and reflections or glare.

(B) Prior to commencing the flight test evaluation, a daylight familiarization flight of the flight test area should be performed. Any specific flight regimes, maneuvers, terrain, or landing areas that

View figures, tables and original page layoutOriginal source page Source page 975 · PDF page 975 of AC 27-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-27

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.