AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(b) Approach segment flight path and glide path should be recaptured and stabilized prior to the final approach fix (FAF) for the intermediate segment and the Missed Approach Point (MAP) for the final segment.
(c) Vertical speed in the descent should be less than 1,000 fpm.
(d) Torque values should be high enough to keep from entering autorotation.
(e) The pilot should have enough time to easily transition to the visual segment
(B) Ability to maintain airspeed at or below the maximum airspeed for the approach.
(C) Maximum allowable tail winds (many steep angle approaches have only one inbound course).
(D) Effect of approach downgraded from LPV to LNAV before and after the FAF, which may require either continuation of the approach or execution of a missed approach.
(viii) Assess the pilot workload and procedures, with autopilot coupled, on complete approaches using transition waypoints and vectors-to-final.
(A) For steepest glide path angle and approach airspeed for which approval is requested.
(B) Assess the handling qualities with the autopilot coupled. If a 4-axis autopilot is proposed, then evaluate the loss of each axis on approach procedures and aircraft handling characteristics.
(C) Assess the transition from coupled instrument flight to uncoupled visual flight at the Decision Altitude (DA).
(a) Accomplish the continuation of the approach in the visual mode to assess the workload required to slow the aircraft at a point to make a landing.
(b) For rotorcraft with Category A procedures, ensure the aircraft can slow to the appropriate speed by the designated landing decision point from the DA.
(ix) If not evaluating the steep angle approaches for IFR aircraft, then apply a limitation in the rotorcraft flight manual or rotorcraft flight manual supplement limiting IFR coupled RNAV approach operations to a maximum glidepath
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source