FAA Advisory circularActive — selected source checked

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

27-1B · Changes 1–9 incorporated Source checked 2026-11-28

Scope, source and reading notes

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

Source page 597 · PDF page 597

6/23/23 AC 27-1B, Chg 9

(4) Safety Assessment Process Overview.

(i) When showing compliance with § 27.1309, the considerations covered in this guidance should be addressed in a methodical and systematic manner. This section of the AC is provided primarily for the use by applicants who are not familiar with the various methods and procedures generally used in the industry to conduct safety assessments. This section and Figures AC 27.1309-4 and AC 27.1309-5 are not intended to be certification checklists, and they do not include all of the information provided in this guidance. This section contains one method, but not the only method, for showing compliance. The safety assessment process is a structured method of general applicability for showing compliance with the regulation. Other methodologies may be used to show compliance, but the safety assessment process is the only structured process that is defined, and these defined objectives would be the logical criteria applied to any other means of showing compliance. More detailed guidance can be found in SAE ARP4761 on how to perform a safety assessment. SAE ARP4754A, discussed in AC 20-174, includes additional information on how the safety assessment process relates to the system development process.

(ii)The safety assessment process contains several parts that may be necessary as a whole or in part, depending on the criticality or complexity of the system under consideration. The rigor of assessment and analysis performed is also dependent on the system criticality or complexity. At the extremes, some systems may be simple enough such that the entire safety assessment can be performed by observation and compliance shown by a simple statement. Complex and higher criticality systems may require application of all of the safety assessment elements to show compliance. Many states of varying complexity exist between these extremes that may use less than the entire safety assessment process but require more than a simple statement to show compliance. For purposes of the FHA, an autorotation is not considered continued safe flight and landing.

(iii) Typical elements of the safety assessment process are as follows:

 Functional Hazard Assessment (FHA)  Preliminary System Safety Assessment (PSSA) o Fault Tree Analysis (FTA)  System Safety Assessment (SSA) o Failure Mode and Effect Analysis (FMEA)  Common Cause Analysis (CCA) o Zonal Safety Analysis (ZSA) o Particular Risk Assessment (PRA) o Common Cause Analysis (CMA)

View figures, tables and original page layoutOriginal source page Source page 597 · PDF page 597 of AC 27-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 29-2C

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-27

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.