AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(x) Hoist operator safety device. When hoisting operations require the presence of a hoist operator on board, appropriate provisions shall be provided to allow the hoist operator to perform his task safely. These provisions shall include an appropriate hoist operator restraint system. This safety device is typically composed of a safety harness and a strap attached to the cabin used to adequately restrain the hoist operator inside the cabin while operating the hoist. For certification approval, the hoist operator safety device should comply with § 27.561(b)(3) for personnel safety. The applicant should submit a design evaluation that assures the necessary level of personnel safety is provided. The safety harness and strap should meet the requirements of TSO C22g, TSO C114, or TSO C167; however, as a minimum, the following should be evaluated:
(A) The strap attaching point on the body harness should not be located in the back of the hoist operator due to safety issues in case of a fall or crash.
(B) The safety device should be designed to be adjustable so that the strap is tightened behind the hoist operator.
(C) The strap might include a QRS including a DAD to allow hoist operator detaching from cabin in emergency conditions (e.g., crash).
(D) The safety device should be easily and readily ingressed or egressed.
(E) It should be placarded for proper capacity and lifetime limitation.
(F) Any fabric used should be durable and should be at least flame resistant.
(11) Section 27.865(c)(4) Intercom Systems for HEC Operations. For all HEC operations, the rotorcraft is required to be equipped for, or otherwise allow direct intercommunication under any operational conditions among crewmembers and the HEC. An intercommunications system may also be approved as part of the external load system, or alternatively a limitation may be placed in the RFM or RFMS as described under paragraph d.(4)(ii)(B)(2) of this guidance).
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source