AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
6/23/23 AC 27-1B Chg 9 6/23/23
SUBPART E - POWERPLANT (continued)
POWERPLANT FIRE PROTECTION
....................................................... E-124 Flammable Fluids.............................................................................. E-125 Ventilation and Drainage................................................................... E-126 Shutoff Means................................................................................... E-127 Firewalls............................................................................................ E-128 Cowling and Engine Compartment Covering .................................... E-132 Cowling and Engine Compartment Covering .................................... E-133 Other Surfaces.................................................................................. E-134 Fire Detector Systems....................................................................... E-135
Lines, Fittings, and Components AC 27.1183 AC 27.1185 AC 27.1187 AC 27.1189 AC 27.1191 AC 27.1193 AC 27.1193A AC 27.1194 AC 27.1195
SUBPART F - EQUIPMENT
GENERAL
Function and Installation ................................................................... F-1 Flight and Navigation Instruments..................................................... F-1 Powerplant Instruments .................................................................... F-7 Powerplant Instruments .................................................................... F-8 Powerplant Instruments .................................................................... F-9 Powerplant Instruments .................................................................... F-11.1 Miscellaneous Equipment ................................................................. F-12 Equipment, Systems, and Installations ............................................. F-13 Equipment, Systems, and Installations ............................................. F-30 Equipment, Systems, and Installations ............................................ F-30.1 Electrical and Electronic System Lightning Protection ...................... F-31 High-Intensity Radiated Fields (HIRF) Protection.............................. F-32
AC 27.1301 AC 27.1303 AC 27.1305 AC 27.1305A AC 27.1305B AC 27.1305C AC 27.1307 AC 27.1309 AC 27.1309A AC 27.1309B AC 27.1316 AC 27.1317
INSTRUMENTS: INSTALLATION
Arrangement and Visibility................................................................. F-34
Warning, Caution, and Advisory Lights ............................................. F-34.2 Airspeed Indicating System............................................................... F-39 Static Pressure Systems ................................................................... F-40 Magnetic Direction Indicator.............................................................. F-41 Automatic Pilot System ..................................................................... F-41 Automatic Pilot System. .................................................................... F-51 Automatic Pilot System and Flight Guidance System. ...................... F-52.1 Flight Director Systems ..................................................................... F-53
Flight Director Systems ..................................................................... F-54.1 Powerplant Instruments .................................................................... F-54.2 Powerplant Instruments .................................................................... F-54.3
AC 27.1321 AC 27.1322 AC 27.1323 AC 27.1325 AC 27.1327 AC 27.1329 AC 27.1329A AC 27.1329B AC 27.1335 AC 27.1335A AC 27.1337 AC 27.1337A
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source