AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
restraining the upper torso, the total strap tension load does not exceed 8.90kN (2,000 lbs).
(vi) The maximum compressive load measured between the pelvis and the lumbar column of the (ATD) does not exceed 6.67 kN (1,500 lbs.).
(vii) Each upper torso restraint strap remains on the ATD shoulder during impact.
(viii) The pelvic restraint remains on the ATD pelvis during impact.
f. Procedures for Evaluating Impact Pulse Shapes.
(1) Acceptable Evaluation Method. Data for evaluating the impact pulse shape are obtained from an accelerometer which measures the acceleration on the test fixture or sled at the seat location or equivalent location in the direction parallel to the line of inertial response shown in Figure 27.562-1 of this guidance. The impact pulses intended for the tests discussed in this guidance have an isosceles triangle shape. These ideal pulses are considered minimum test conditions. Since the actual acquired test pulses will normally differ from the ideal, it may be necessary to evaluate the acquired test pulses to insure the minimum requirements are satisfied.
(2) An acceptable method to evaluate the pulse shape should use the following steps:
(i) Extend the calibration baseline (zero G)
(ii) Locate the maximum peak deceleration (Gp) indicated on the plot.
(iii) Construct reference lines parallel to the baseline at levels of 0.1 Gp, 0.9 Gp, and 1.0 Gp.
(iv) Construct an onset line through the intersection points of the 0.1 Gp and 0.9 Gp reference lines with the increasing (onset) portion of the data plot. The data plot should not return to zero G between the two points selected.
(v) Locate the intersection points of the onset line with the baseline and with the 1.0 Gp reference line. The interval between these two points, measured along the time axis of the data plot, is considered the rise time (tr) of the test impact pulse.
(vi) The rise time of the test impact pulse should not exceed the value of (tr) given in Figure AC 27.562-1 for each test.
(vii) The area under the data plot curve within the rise time of the test impact pulse, Vra, should represent at least one half of the impact velocity given in Figure AC 27.562-1 for each test. If the value of peak acceleration measured in the test
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source