AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(MANUAL IDENTIFICATION) CHAPTER 7 LIFTING AND SHORING 1. LIFTING. The ICA must include instructions including procedures for lifting. Lifting instructions are divided in two areas - jacking information and lifting instructions. Reference Appendix A, A27.3 (b)(4).
a. JACKING INFORMATION
(1) The ICA must include information for jacking.
(2) Jacking information normally includes:
(a) A description of the jacking system. (b) Location of jack pads. (c) Procedure for installing and removing jack pads. (d) Procedure for installation and removal special fixtures. (e) Specify special tools and equipment required for jacking. (f) The minimum capacity of the jacks required. (g) Procedure for jacking includes: action to be accomplished before jacking, the order and method of jacking helicopter, and actions to be accomplished after jacking.
(h) Precautions to be taken.
b. LIFTING INSTRUCTIONS
(1) The ICA must include instructions for lifting.
(2) Lifting instructions normally include:
(a) A description of the lifting system. (b) Location of hoist attachments (c) Procedure for installing and removing lifting tools and equipment (d) Special tools and equipment required for lifting. (e) The minimum capacity of the lifting equipment. (f) Procedure for lifting includes: actions to be accomplished before lifting, the order and method of lifting the helicopter, and actions to be accomplished after lifting.
(g) Precautions to be taken.
2. SHORING INSTRUCTIONS
a. The ICA must include instructions including procedures for shoring. Reference Appendix A, A27.3 (b)(4) .
b. Shoring instructions normally include:
(1) A description of the task to be accomplished prior to shoring the rotorcraft. (2) A description of the order and method of shoring the rotorcraft. (3) Special procedures to be used during shoring of the rotorcraft. (4) Specify precautions to be used during shoring of the rotorcraft. (5) Specify tool(s), special tool(s), or equipment required for shoring. REVISION: (PAGE NUMBER) Revision 2 07-00-00 Page 1
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source