Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(MANUAL IDENTIFICATION) INSPECTION EXAMPLE: 100-Hour Inspection N________ Serial Number ______________ Aircraft Hours_________ Total Time __________
The 100-Hour Inspection shall be accomplished each 100 hours time-in-service. Initial each item after accomplishing the inspection. Record all findings and attach a copy to this inspection form. After correction of all findings, make maintenance record entry.
PRE-INSPECTION INITIAL EACH ITEM AFTER ACCOMPLISHMENT INITIAL 1. Describe pre-inspection actions Example: 1. Review Rotorcraft and Engine Maintenance Records. Example: 2. Review Airworthiness Directives.
MAINTENANCE PRACTICES INITIAL EACH ITEM AFTER ACCOMPLISHMENT INITIAL 1. Describe access panel to be removed and door to be opened. Example: 1. Remove access panel P3, P4, P5, P6, P7, P8, D1, D5, D10, D15 etc. 2. Describe maintenance action required to accomplish the inspection. Example: 1. Clean (appliance) using Arro ACR-223 solvent. Example: 2 Lubricate (appliance) in accordance with Chapter 12. 3. Describe Special tool and equipment required for the inspection. Example: 1. Place jacks under helicopter and jack up aircraft. Example: 2. Use a 10-power magnifying glass and bright light required for inspection.
INSPECTION INITIAL EACH ITEM AFTER ACCOMPLISHMENT INITIAL 1. Describe the item being inspected, its location, and what the item is being inspected for. Provide any special instructions or technique to be used, identify special tool required, and provide information on the standard that the item should meet. Example: 1. (Appliance)
Inspect (appliance) for cleanliness, corrosion and security. Example: 2. (Appliance)
Inspect (appliance) for scratches, dent, delamination and cracks. Cracks up to .040 may be repaired. Appliance with cracks longer than .040 part should be replaced. Example: 3. (Appliance) Inspect (appliance) for due dates and expiration. Example: 4. (Appliance)
Inspect (appliance) for security, lack of lubrication, and freedom of movement, and wear. Acceptable wear is .003 to .005.
Example: 5. (Appliance)
Inspect (Appliance) attachment nuts for correct torque. Set torque wrench to 22 inch lbs. and torque nut. If nut moves, replace (appliance). Example: 6. (Appliance)
Inspect (Appliance) for correct operations, etc.
POST INSPECTION INITIAL EACH ITEM AFTER ACCOMPLISHMENT INITIAL Describe post actions such as protective coating, servicing or lubrication appliances, installation of
access panels and doors, run up and system operations. Example: 1 Complete maintenance practices for the inspection, i.e., install access panels and close doors opened for the inspection, remove aircraft form jacks, etc. Example: 2 Perform run up or system operation and verify correct function and operation. Example: 3 Complete and sign aircraft’s maintenance record entry Mechanic Name _________________________ Signature_______________________ # ______________ Inspector Name _________________________ Signature_______________________ # ______________
REVISION: (PAGE NUMBER) Revision 4 05-00-00 Page 4
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.