AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(MANUAL IDENTIFICATION) TABLE OF CONTENTS (Continued) Identification Title Page
CHAPTERS 21, 22, 23, 24, 25, 26, 27, 29, 30, 31,33, 34, 35, 36, 37, 45, 49 AIRFRAME SYSTEMS ( )-00-00 52, 53, 54, 55, 56. STRUCTURES ( )-00-00 62, 63, 64, 65, 66, 67, ROTORS ( )-00-00 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, and 83 POWERPLANT ( )-00-00 1 REQUIREMENTS 1 1. INTERFACE INFORMATION 1 2. DESCRIPTION OF ROTORCRAFT AND ITS SYSTEMS AND INSTALLATIONS 1 3. DESCRIPTION OF ROTORCRAFT’S ENGINE(S) 1 4. DESCRIPTION OF ROTORCRAFT’S ROTOR(S) 2 5. DESCRIPTION OF ROTORCRAFT’S APPLIANCES 2 6. BASIC CONTROL AND OPERATING INFORMATION 2 7. SERVICING INFORMATION 3 8. LOCATION OF ACCESS PANELS 3 9. LUBRICATION INFORMATION 3 10. EQUIPMENT REQUIRED FOR SERVICING 4 11. RECOMMENDED PERIODS 4 12. DEGREE OF THE INSPECTION 4 13. WORK RECOMMENDED 5 14. APPLICABLE WEAR TOLERANCE 5 15. TROUBLESHOOTING 5 16. ORDER AND METHOD OF REMOVAL 6 17. ORDER AND METHOD OF REPLACING 6 18. GENERAL PROCEDURAL INSTRUCTIONS - TESTING 6 19. GENERAL PROCEDURAL INSTRUCTIONS - CHECKING 7 20. STORAGE LIMITATIONS 7 21. SPECIAL INSPECTION TECHNIQUES 7 22. PROTECTIVE TREATMENT 7 23. STRUCTURAL FASTENERS 8 24. SPECIAL TOOLS 8
Attachment 1 PART 27 REQUIREMENTS 1 Attachment 2 INSTRUCTIONS FOR CONTINUED AIRWORTHINESS PROCEDURES
INFORMATION 1 Attachment 3 ATA CHAPTER LISTINGS 1 Attachment 4 TYPE DESIGN CHANGE ICA RECOMMENDED PROCRDURE 1
REVISION: (PAGE NUMBER) Revision 4 Page ix
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source