AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
(i) RTCA Document DO-178C, Software Considerations in Airborne Systems and Equipment Certification, dated December 13, 2011.
(ii) RTCA Document DO-254, Design Assurance Guidance for Airborne Electronic Hardware, dated April 19, 2000.
(iii) RTCA Document DO-297, Integrated Modular Avionics (IMA) Development Guidance and Certification Considerations, dated November 8, 2005.
c. Background. The FAA recognizes the importance of timely completion of an FHA to minimize TC, amended TC, STC, amended STC, and TSOA project delays and potential risks of redesigns required late in a project because of information obtained from the completed FHA. Applicants are expected to not only properly complete FHAs as early as possible to minimize the risks described above, but also obtain FAA acceptance of the FHAs.
d. When to create an FHA. The FAA expects a discussion of the FHA take place during the very early stages of the TC, amended TC, STC, amended STC project (i.e., during the Familiarization Briefing). This will provide the FAA with the necessary design safety aspects information while the development is still in the conceptual and requirements definition phases. Since the FHA process is designed to provide the system level safety and derived requirements, it is imperative that the applicant obtain FAA acceptance of the FHA as early as possible in the systems development (i.e., prior to submitting the certification plan). This will minimize the risk of the applicant’s design requiring changes late in the program to satisfy safety requirements obtained from the completed FHA.
e. How to create an FHA.
(1) The process to create an FHA can be considered fairly complicated if doing it for the first time. This guidance presumes that an applicant is familiar with ARP 4761 and is looking for some additional guidance in recognizing some of the likely functions of each system and the associated failure conditions (FC) that should be reflected in a FHA. The table in Figure AC 27 MG 21-1 provides a snapshot of considerations an applicant should address when examining their design for a systematic safety review. This table not a complete list nor are the FCs listed in the figure applicable for all designs.
(2) One additional item is the need to include a complete list of assumptions made when developing the FHA. These assumptions may include the intended aircraft (single or dual engine, existing certificated interfacing equipment), type of operation (e.g., IFR, VFR, category A), crew composition (e.g., single pilot, dual pilot), etc. These should be listed in the front of the document prior to the functional failure conditions matrix.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source