AC 27-1B
Certification of Normal Category Rotorcraft — Changes 1–9
27-1B · Changes 1–9 incorporated Source checked 2026-11-28
Scope, source and reading notes
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
Aerospace Consulting reference note: Complete normal-category rotorcraft guidance, including system safety, equipment, flight guidance and IFR certification.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b
from subject pilots may be used. For example, the FAA and U.S Air Force developed a report for certification use to assist in evaluation of pilot workload. This report, “Assessment of Crew Workload Measurement Methods, Techniques, and Procedures,” Volume II (Report No. WRDC-TR-89-7006), provides guidance for selecting and using a number of subjective, physiological, and performance based workload measurement techniques.
(E) Depending on the level of integration required, use of a buildup approach may be helpful. Use of integrated bench tests, ground mock-ups, and if possible ground tests with an installed system helps identify issues early. Use of video and audio recordings can assist in analyzing pilot interactions with systems in all phases of testing including flight tests. Test flights should assess workload in all expected environments and for all operations requested in accordance with § 27.1525, part 91, and part 135.
(F) An evaluation team is usually assembled when certificated systems and the proposed system are significantly different. Such a team includes applicant test pilots, certification authority test pilots, and, if the certification team deems it advisable, “line pilots” who routinely fly similar rotorcraft. The testing should be conducted using scenarios representative of the type of operations used for the rotorcraft. Testing should include various types of routes, navigational aids, environmental conditions and traffic densities. Give particular attention to tasks that involve planning and execution of emergency and non-normal procedures. When appropriate, also consider dispatch under the Master Minimum Equipment List in combination with other failures that are likely to result in significantly increased pilot and crew workload. Since display format and media also influence workload, the number, size, location, type of display, and presentation format should also be part of the overall evaluation.
(G) Discussion of minimum crew and the associated crew workload between the involved certification authorities and the applicant should take place early in the development cycle. These discussions should focus on identification of design features that are likely to affect crew workload. These design features need to be evaluated to ensure that they do not place excessive workload demands on any crewmember. Applicants should submit a test plan describing the details of the evaluation approach. Although developed for transport category airplanes, AC 25.1523 also contains useful information to address this rule.
(xv) Section 27.1555(a). The intent of this regulatory provision is to ensure that pilots can quickly and unambiguously identify the function and understand the method of operation for each cockpit control. In conventional designs, the marking or labeling of controls may be accomplished using text that describes the function of that control. With the advent of MFDs and integrated systems, there is an emerging trend to integrate control functions into these displays. Many traditional systems (e.g., fuel, power, electrical, warning, and caution) are being integrated into a single display along with their associated control function and corresponding labels. The operation of these systems is accomplished via interaction with MFD controls (bezel switches, touch screens, etc.) and software control labels or icons that appear on the display screen. Carefully evaluate the design of these labels and their associated meanings to determine that they adequately convey and completely define the control function and system operation. Often, a single text message or acronym may not be sufficient to completely describe the function and operation of that control.
(A) There has also been a growing trend to use icons rather than text on some of these displays. The symbol used can often be difficult to interpret or require training for the pilot to remember what it means. The overuse of symbols may require the pilot to revert to a manual for interpretation. Therefore, ensure that pilots will be able to identify control functions with an acceptable level of accuracy and consistency and in a timely manner. If icons are used, there should be no reduction in the level of pilot performance when compared with performance obtained using text labeling, and can be measured using time to interpret and accuracy of interpretation of that control function.
(B) There has also been a trend toward using multifunction controls (soft-keys) more in rotorcraft. Pilots must be able to quickly and reliably identify the function controlled by these software labels. Pilots should be capable of performing control-related tasks to the same performance standards
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source