Certification of Normal Category Rotorcraft — Changes 1–9
Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.
This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.
The source, within reach.
Search within this AC, jump to a source page, or download the complete saved publication.
This extraction supports search. Read the original page for complete notation and layout.
AC 27-1B, Chg 9
6/23/23
Page No.
SUBPART D - DESIGN AND CONSTRUCTION (continued)
FIRE PROTECTION
AC 27.853 Compartment Interiors ...................................................................... D-98
AC 27.853A Compartment Interiors ..................................................................... D-99
AC 27.855 Cargo and Baggage Compartments.................................................. D-99
AC 27.859 Heating Systems............................................................................... D-101
AC 27.861 Fire Protection of Structure, Controls, and Other Parts..................... D-105
AC 27.861A Fire Protection of Structure, Controls, and Other Parts..................... D-106
AC 27.863 Flammable Fluid Fire Protection ....................................................... D-107
EXTERNAL LOADS
AC 27.865 External Load Attaching Means ........................................................ D-109
AC 27.865A External Load Attaching Means ........................................................ D-110
AC 27.865B External Loads (previously MG 12)................................................... D-111
MISCELLANEOUS
AC 27.871 Leveling Marks .................................................................................. D-133
AC 27.873 Ballast Provisions.............................................................................. D-133
SUBPART E - POWERPLANT
GENERAL
AC 27.901 Installation......................................................................................... E-1
AC 27.901A Installation......................................................................................... E-5
AC 27.903 Engines ............................................................................................. E-5.2
AC 27.903A Engines ............................................................................................. E-7
AC 27.903B Engines ............................................................................................. E-9
AC 27.903C Engines ............................................................................................. E-10.1
AC 27.907 Engine Vibration................................................................................ E-10.1a
ROTOR DRIVE SYSTEM
AC 27.917 Design............................................................................................... E-10.2
AC 27.921 Rotor Brake....................................................................................... E-11
AC 27.923 Rotor Drive System and Control Mechanism Tests........................... E-12
AC 27.923A Rotor Drive System and Control Mechanism Tests........................... E-17
AC 27.923B Rotor Drive System and Control Mechanism Tests........................... E-18
AC 27.927 Additional Tests................................................................................. E-19
AC 27.927A Additional Tests................................................................................. E-21
AC 27.931 Shafting Critical Speeds.................................................................... E-21
Page ix
Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.
Aerospace Consulting / Engineering perspective
Start with the certification basis and the function.
Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.
1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.
A focused review, an agreed assessment package or ongoing support alongside your team. We can agree the relevant inputs and scope in the initial conversation.
This opens your email application.
Start a conversation
Tell us about your programme, the system you are developing and the support you need.
We can agree a focused use-case review, a defined evidence package or ongoing programme support.
This opens your email application.
Specialist aerospace expertise
Aerospace Consulting is led by Hussein Khimji, an FAA Designated Engineering Representative in systems and equipment, with a focus on system safety, flight controls and avionics.
We work with aircraft developers and systems suppliers to connect technical decisions, safety assessments and certification evidence.
This is the proposed introduction. The full About page will add your approved biography and associate expertise.
Systems engineering & development assurance
Tell us about the aircraft or system, its intended function, stage of development and the support you need.