FAA / Advisory circular

AC 27-1B

Certification of Normal Category Rotorcraft — Changes 1–9

Normal category rotorcraft guidance with Changes 1–9 incorporated. Search the complete AC or start with the system safety, flight controls and instrument-flight guidance.

Start with the scope.

This source includes guidance for different amendments of Part 27. Match the guidance to the aircraft’s agreed certification basis: the 27.1309 entries for Amendments 27-21, 27-46 and 27-51 are separate. The base AC was issued on 30 September 1999; Change 9 is dated 23 June 2023. The FAA catalogue’s 30 September 2008 date is not the date of the latest change.

The source, within reach.

Search within this AC, jump to a source page, or download the complete saved publication.

Download saved FAA PDF ↓

Read the source

The document, within reach.

FAA source document

Printed page Apdx A-9

PDF page 1112 of 1196

Enlarge original ↗

Original FAA page, including its printed amendment and change markings. Extracted words support search; text reflow has not been reviewed.

Original FAA AC 27-1B, PDF page 1112
AC 27-1B · Apdx A-9Open saved PDF here ↗
Extracted text for finding words

This extraction supports search. Read the original page for complete notation and layout.

2/12/03                                          AC 27-1B, Chg 1

                                    (MANUAL IDENTIFICATION)
                     TABLE OF CONTENTS

Identification       Title                 Page
CHAPTER 1   INTRODUCTION  01-00-00                               1
                       1. ACCEPTABLE TO THE FAA/AUTHORITY               1
                       2. MANUALS                                         2
                       3. CONTENTS                                        2
                       4. SCOPE                                            2
                       5. PURPOSE                                          2
                       6. ARRANGEMENT                                    2
                       7. SUPERSEDED DOCUMENTS                         3
                       8. APPLICABILITY                                    3
                       9. DEFINITIONS                                      3
                    10. ABBREVIATIONS                                   3
              11.ACRONYMS                                        3
                    12. SYMBOLS                                         4
                    13. PRECAUTIONS                                     4
                    14. UNITS OF MEASUREMENT                          4
                    15. ICA FOR EACH ENGINE                             4
                    16. ICA FOR EACH ROTOR                              4
                    17. ICA FOR EACH APPLIANCE REQUIRED BY THIS
               CHAPTER                                          4
                    18. INFORMATION ESSENTIAL TO THE CONTINUED
                AIRWORTHINESS OF THE ROTORCRAFT               5
                    19. REFERENCED PUBLICATIONS                       6
                    20. DISTRIBUTION                                    7
                    21. ROTORCRAFT FEATURES                           7
                    22. CORRECTIONS TO ORIGINAL INSTRUCTIONS FOR
                CONTINUED AIRWORTHINESS                       8
                   23. INDICATING CHANGES TO INSTRUCTIONS FOR
               CONTINUED AIRWORTHINESS                       8
CHAPTER 4    AIRWORTHINESS LIMITATIONS SECTION  04-00-00         1
                      1. AIRWORTHINESS LIMITATIONS INFORMATION         1
                      2. NO AIRWORTHINESS LIMITATIONS INFORMATION
                 REQUIRED.                                        1

CHAPTER 5    INSPECTION REQUIREMENTS AND OVERHAUL
             SCHEDULE 05-00-00                                   1
                      1. INSPECTION REQUIREMENTS                        1
                      2. COMPONENT OVERHAUL SCHEDULE                 3
                      3. NO OVERHAUL REQUIRMENTS                       3
                      4. INSPECTION EXAMPLE                              3

REVISION:                                         (PAGE NUMBER)
Revision 4                                                         Page vii


                                                                   Page Apdx A - 9

Saved from the FAA on November 17, 2026. All original pages are retained. Engineering explanations are presented separately below.

Aerospace Consulting / Engineering perspective

Start with the certification basis and the function.

Identify the applicable amendment before selecting the safety guidance. Connect intended functions and operating conditions to failure conditions, architecture decisions, common-cause considerations, verification and limitations. For flight controls and IFR work, carry the relevant 27.672, 27.1329 and Appendix B assumptions into the system safety and compliance evidence.

Explore the rotorcraft safety and certification approach →
Source edition and reading coverage

1196 original pages. 0 pages have reviewed text reflows. Original-first pages retain the source layout, with extracted text available for finding words.

Source SHA-256: 2dfac16a3644dc18997069cca78746c10726e4b70d3aba996fc87843ffe68a2b

This is a dated source copy. Automatic source acquisition is not yet scheduled.

Original FAA PDF ↗

Working through a certification question?

Bring the aircraft, the basis and the issue your team needs to resolve.

Discuss your programme →