FAA Advisory circularActive

AC 20-136C

Aircraft Electrical and Electronic System Lightning Protection

20-136C Source checked 2026-11-28

Scope, source and reading notes

Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.

Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd

Source page 31 · PDF page 31

10.11.3 You should use the information in Table 4 to evaluate your aircraft and system installation features to select appropriate ETDLs for your system. Table 4 defines test levels for ETDLs, based on RTCA/DO-160 section 22, Tables 22-2 and 22-3. Provide the cognizant certification branch with a description of your aircraft and display system installation features and compare these to the information in Table 4 to substantiate the ETDL selected for your aircraft and LCL A display system installation. When selecting ETDLs using guidance provided in Table 4, an acceptable margin between anticipated ATLs for display system installations is incorporated in the selected ETDLs.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-136A

Related technical context

Engineering context
Evidence and scope

AC 20-136C and AMC 20-136A — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.