FAA Advisory circularActive

AC 20-136C

Aircraft Electrical and Electronic System Lightning Protection

20-136C Source checked 2026-11-28

Scope, source and reading notes

Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.

Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd

Source page 19 · PDF page 19

Table 3. Items Recommended for a Lightning Certification Plan

ITEM DISCUSSION

Description of

Systems

Describe systems’ installation, including unusual or unique features; the system failure condition classifications or initial LCLs; the operational aspects; lightning attachment zones; lightning environment; preliminary estimate of ETDLs and TCLs; and acceptable margins between ETDLs and ATLs.

Description of Compliance Method

Describe how to verify compliance. Typically, your verification method includes similarity, analytical procedures, and tests. If using analytical procedures, describe how to verify them. (See paragraph 10.9 of this AC.)

Acceptance Criteria

Determine the pass/fail criteria for each system by analyzing how safe the system is; this information may be finalized in the test plan. During this safety analysis, assess the aircraft in its various operational states; account for the failure and disruption modes caused by the effects of lightning.

Test Plans

Plan each test you include as part of your certification process. As an applicant, you can decide if your test plans are separate documents or part of the certification plan. Your test plans should state the test sequence.

8 LIGHTNING COMPLIANCE.

8.1 Lightning Certification Plan. You should establish an overall certification plan to clearly identify and define lightning certification requirements, lightning protection development, and the design, test, and analysis activities intended to be part of the compliance effort. This plan should provide definitions of the aircraft systems, installations, and protective features against which lightning compliance will be assessed. You should discuss the lightning certification plan with, and submit it to, the FAA for approval before initiating lightning compliance activities. If the aircraft, system, or installation design changes after approval, you should submit a revised lightning certification plan to the FAA for approval. The lightning certification plan should include the following:

• A lightning certification plan summary;

• Identification of the aircraft systems (see section 7.2), with classification based on the safety assessment as it relates to lightning;

• The expected lightning environment for the aircraft and installed systems; and

• The verification methods, such as test, analysis, or similarity.

View figures, tables and original page layoutOriginal source page Source page 19 · PDF page 19 of AC 20-136C

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-136A

Related technical context

Engineering context
Evidence and scope

AC 20-136C and AMC 20-136A — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.