Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.
Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd
knowledgeable estimates. These expected aircraft lightning transient levels are termed transient control levels (TCL). Specify the TCL’s voltage and current amplitudes and waveforms based upon the expected lightning transients that would be generated on wiring in specific areas of the aircraft. The ATLs should not exceed the aircraft TCLs. The TCLs for a specific wire bundle depend on the configuration of the aircraft, the wire bundle, and the wire bundle installation. You should design your aircraft lightning protection to meet the specified TCLs.
7.8 Verify Compliance with the Regulations.
7.8.1 You must demonstrate that the systems comply with the applicable requirements of §§ 23.1306 (amendment 23-61), 23.2515, 25.1316, 27.1316, or § 29.1316.
7.8.2 You should demonstrate that the ETDLs exceed the ATLs by the margin established in your certification plan.
7.8.3 Verification may be accomplished by tests, by analysis, or by demonstrating similarity with previously certified aircraft and systems. The certification process for LCL A systems is discussed in paragraph 10. The certification process for LCL B and C systems is discussed in paragraph 11.
7.8.4 Submit your certification plan early in the program to the cognizant certification branch for review. Experience shows, particularly with aircraft using new technology or those that have complex systems, that early agreement on the certification plan benefits both the applicant and the cognizant certification branch. The plan should define acceptable ways to resolve critical issues during the certification process. Analysis and test results during the certification process may warrant modifications in the design or verification methods. When significant changes are necessary, update the certification plan accordingly. The plan may include the items listed in Table 3.
Note: You may refer to paragraph 8.1 for more information.
7.9 Take Corrective Measures. If tests and analyses show that the system did not meet the pass/fail criteria, review the aircraft, installation, or system design and improve protection against lightning.
7.10 Margins. Margins account for uncertainty in the verification process. For lightning certification, the margin is the difference between the ETDLs and ATLs. The verification approach should be described in the certification plan with justification for margin, which requires agreement by the respective FAA certification branch. Refer to paragraph 10.12 for additional guidance on margin.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-136C and AMC 20-136A — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source