FAA Advisory circularActive

AC 20-136C

Aircraft Electrical and Electronic System Lightning Protection

20-136C Source checked 2026-11-28

Scope, source and reading notes

Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.

Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd

Source page 35 · PDF page 35

electrical bonding between permanent structural joints. Electrical bonding straps or jumpers should be installed on moving parts or for removable panels or parts.

• For airplanes with primarily carbon fiber or fiberglass structure, you should incorporate metal mesh, metal foil, or expanded metal foil onto the external surfaces of the airplane composite structure. This mesh or foil should be joined together electrically and provide a continuous electrical conductor between the extremities of the airplane. Use of metallic components internal to the structure of the airplane may also be used to provide similar shielding for equipment and its wiring.

• For airplanes constructed of tube and fabric, the tube skeleton may be considered as the low impedance electrical path through the airplane. Electrical bonding may also be achieved using bonding straps or jumpers where required to electrically bond other metallic sub-structure that might be relied upon to provide bonding for equipment.

10.14.10 Electrical bonding specifications and verifications should be developed and implemented on the production drawings and instructions for continued airworthiness.

11 STEPS TO LCL B AND C SYSTEM LIGHTNING COMPLIANCE. Steps 1 through 8 listed below in this section may be used to demonstrate compliance for LCL B and C systems with §§ 23.1306(b) (amendment 23-61), 23.2515(b), 25.1316(b), 27.1316(b), or § 29.1316(b). Section 23.2515(b) only applies to LCL B systems with hazardous failure conditions (reference Table 2).

11.1 Step 1 – Identify LCL B and C Systems.

11.1.1 Identify your LCL B and C systems as described in paragraphs 7.2 and 7.3.

11.1.2 Define the detailed system performance pass/fail criteria. You should get certification branch concurrence on this criterion before you start testing or analyzing your LCL B and C systems.

11.1.3 Figure 3 illustrates a process you can use to demonstrate that your LCL B and C systems comply with 14 CFR requirements.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AMC 20-136A

Related technical context

Engineering context
Evidence and scope

AC 20-136C and AMC 20-136A — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.