Scope, source and reading notes
Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.
Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd
9.2 System Functional Upset.
9.2.1 Functional upset is mainly a system problem caused by electrical transients. It may permanently or momentarily upset a signal, circuit, or system component, which can adversely affect system performance enough to compromise flight safety. A functional upset is a change in digital or analog state that may or may not require manual reset. In general, functional upset depends on circuit design and operating voltages, signal characteristics and timing, and system and software configuration.
9.2.2 Systems or devices that may be susceptible to functional upset include computers and data/signal processing systems, electronic engine and flight controls, and power generating and distribution systems.
10 STEPS TO LCL A SYSTEM LIGHTNING COMPLIANCE. Steps 1 through 13 listed below in this section may be used to demonstrate LCL A system compliance with §§ 23.1306(a) (amendment 23-61), 23.2515(a), 25.1316(a), 27.1316(a), or § 29.1316(a). Figure 2 also depicts these compliance steps. Airplanes certified under part 23 may use steps 1 through 13 to demonstrate compliance with §§ 23.1306(a) (amendment 23-61) or § 23.2515(a), but acceptable compliance for LCL A systems on level 1, 2, and 3 airplanes may also be shown using the method in paragraph 10.14 below.
10.1 Step 1 – Identify LCL A Systems.
10.1.1 Identify your LCL A systems as described in paragraph 7.2. Define the detailed system performance pass/fail criteria. A certification branch should concur with this criteria before you begin testing or analyzing your LCL A system. Identify specific equipment, components, sensors, power systems, and wiring associated with each LCL A system in order to perform the ETDL verification discussed in paragraphs 10.5 and 10.6.
10.1.2 When demonstrating compliance with §§ 23.1306(a) (amendment 23-61), 23.2515(a), 25.1316(a), 27.1316(a), or § 29.1316(a), the LCL A electrical and electronic system includes all electrical and electronic equipment, components, and electrical interconnections required to perform the intended functions whose failure is catastrophic, i.e. would prevent continued safe flight and landing. This electrical and electronic system must also automatically recover (or manually for § 23.2515) normal operation of the Level A functions in a timely manner to comply with paragraph (a)(2) of these regulations.
10.1.2.1 The LCL A electrical and electronic system is not required to include—
• equipment, components, and electrical interconnections required only for non-normal situations; or
• equipment, components, and electrical interconnections required only for dispatch under a minimum equipment list.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-136C and AMC 20-136A — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source