AC 20-136C
Aircraft Electrical and Electronic System Lightning Protection
20-136C Source checked 2026-11-28
Scope, source and reading notes
Aircraft electrical and electronic system lightning protection for applicable Part 23, 25, 27, and 29 certification requirements.
Aerospace Consulting reference note: Describes a means of demonstrating lightning-protection compliance for aircraft systems; revision C supersedes AC 20-136B.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: a97137a34f9094ac10e6fb7caba11688edf5ab0b866ddf3d5ffa40f00e327cdd
results of any analysis performed in the overall process of the lightning compliance evaluation.
8.3.2 Analysis Plan. A lightning compliance analysis plan should include the objectives, both at the system and equipment level, for generating data to support lightning compliance verification. Comprehensive modeling and analysis for voltage and current transients to aircraft systems and structures is an emerging technology; therefore, the analysis plan should be coordinated with the FAA to determine an acceptable scope for the analysis. Aircraft testing may be necessary to support the analysis. The analysis plan should include:
• The purpose and scope of the analysis;
• A description of the aircraft and/or system addressed by the analysis;
• System configuration descriptions;
• Proposed analysis methods;
• The approach for validating the analysis results;
• Pass/fail criteria; and
• When data has limited substantiation, a description and justification for margins to account for analysis uncertainty.
8.3.3 Similarity Plan. A similarity plan should describe the approach undertaken to use the certification data from previously certified systems, equipment, and aircraft in the proposed lightning compliance program. The similarity plan should include:
• The purpose and scope of the similarity assessment;
• Specific systems addressed by the similarity assessment;
• Data used from the previously certified systems, equipment, and aircraft;
• Details on differences between the aircraft and system being certified and the similar aircraft and system from which the data will be used; and
• A description and justification for margins to account for similarity uncertainty when data has limited substantiation.
8.4 Compliance Reports. One or more compliance reports may be necessary to document the results of your test, analysis, or similarity assessments. For new or significantly modified aircraft, lightning compliance reports include many system and equipment test reports, aircraft test reports, and lightning vulnerability analysis reports. For these types of lightning certification programs, a compliance summary report may be useful to summarize the results of tests and analysis. For lightning certification programs of relatively simple systems, a single compliance report is adequate.
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 20-136C and AMC 20-136A — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source