EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-27

Small Rotorcraft

Amendment 10; corrected 15 September 2025 Source checked 2026-11-28

Scope, source and reading notes

Complete official CS-27 Amendment 10, including AMC, GM and appendices.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae

Source page 302 · PDF page 302

— be completed prior to formally increasing the TBO to verify acceptable

behaviour and condition of the gearbox components prior to starting a new increase phase.

— Management of TBO steps

The process for managing the evolution of the TBO of drive system gearboxes should be documented in a TBO maturity plan. This should include:

— planned increase steps and target TBO, technical criteria for the

validation of the steps planned and justification of the proposed plan (see note 1);

— definition of the number of gearboxes and selection criteria

considering operation and environment (see note 1);

— definition of responsible parties for performing the TBO step increase

validation inspections, activities involved and information to be reported;

— proposed analysis process of the inspection results, responsible

parties and methods of analysis; and

— the TBO step increase validation process and associated deliverables

(see note 2).

Any findings arising from the TBO development process which might bring into question the suitability of the current TBO or impair the capability of the gearbox to reach the planned increase in TBO should be reported to the Agency.

Finally, if a major change is introduced to or affecting a drive system gearbox, the applicant should evaluate the need to revise the TBO and incorporate additional steps in the gearbox TBO maturity plan.

Note 1: The TBO maturity plan and the associated TBO increase validation criteria should be defined by the applicant and provided to the Agency during the certification process. The results of the process of validation of each step might lead to revisions of the maturity plan.

Note 2: The acceptance of each individual step as well as the closure of the maturity plan should be formally endorsed by the applicant and duly documented.

[Amdt 27/10]

MARKINGS AND PLACARDS

CS 27.1541 General

(a) The rotorcraft must contain:

(1) The markings and placards specified in CS 27.1545 to 27.1565, and

(2) Any additional information, instrument markings, and placards required for the safe operation of rotorcraft with unusual design, operating or handling characteristics.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.