CS-27
Small Rotorcraft
Amendment 10; corrected 15 September 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-27 Amendment 10, including AMC, GM and appendices.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae
AMC1 27.1521 Powerplant limitations
(a) Introduction
This AMC supplements FAA AC 27-1B, § AC 27.1521 and should be used in conjunction with that AC when demonstrating compliance with CS 27.1521.
(b) 30-minute power rating
(1) Explanation
The 30-minute power rating may be set at any level between the maximum continuous up to and including the take-off rating, and may be used for multiple periods of up to 30 minutes each, at any time between the take-off and landing phases in any flight.
This rating is associated with some limitations which should be adequately established and declared.
(2) Procedure
CS 27.1521(a) refers to the limits for which the engines are type certificated. This should include the 30-minute power rating usage and:
— the associated usage limit:
— maximum duration in one single shot up to 30 minutes;
— cumulative limit, if any, in one flight; and
— any other limits associated with the usage of the 30-minute power rating declared
in the installation and/or operating manual of the engine.
[Amdt 27/10]
CS 27.1523 Minimum flight crew
The minimum flight crew must be established so that it is sufficient for safe operation, considering:
(a) The workload on individual crew members;
(b) The accessibility and ease of operation of necessary controls by the appropriate crew member; and
(c) The kinds of operation authorised under CS 27.1525.
CS 27.1525 Kinds of operations
The kinds of operations (such as VFR, IFR, day, night, or icing) for which the rotorcraft is approved are established by demonstrated compliance with the applicable certification requirements and by the installed equipment.
CS 27.1527 Maximum operating altitude
The maximum altitude up to which operation is allowed, as limited by flight, structural, powerplant, functional, or equipment characteristics, must be established.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source