EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-27

Small Rotorcraft

Amendment 10; corrected 15 September 2025 Source checked 2026-11-28

Scope, source and reading notes

Complete official CS-27 Amendment 10, including AMC, GM and appendices.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae

Source page 183 · PDF page 183

The test should demonstrate that, at the determined critical temperature, the maximum potential ice accretions downstream the rotorcraft screen do not have an adverse effect on the engine both in the full range of claimed operation and when the rotorcraft then descends in an atmosphere with a positive OAT.

As an example, the following test procedure may be considered:

— A 1st run: at the end of the test (in fact, when reaching the highest measured pressure drop in the

air intake), perform three consecutive engine quick decelerations (from maximum power to idle) / accelerations (from idle to maximum power).

— A 2nd run: at the end of the test (in fact, when reaching the highest measured pressure drop in

the air intake), simulate a quick descent in atmosphere with a positive OAT considering a tunnel warm-up procedure.

Quick accelerations / decelerations are to be understood as the maximum acceleration / deceleration rates that can be performed by a pilot during flight operation. The intent is to simulate a real-life engine behaviour which affects the flow/ice ingestion accordingly. For example, values close to one second from minimum to maximum power have been considered in the past for such testing.

As specified in CS 27.1093(b)(1)(i), these tests shall demonstrate that the engine operation is not adversely affected by icing conditions.

Whenever an applicant is willing to use previous icing wind tunnel tests, an analysis might be an acceptable means of compliance provided that this analysis is adequately validated and covers as a minimum the changes in configurations (air intakes, engines, engine installations, etc.), engine operability (airflow, ingestion capabilities, surge margins, etc.) and thermal environment of the air intake.

For rotorcraft certified in full icing conditions, in order to determine the rotorcraft performance in icing conditions, this test point should be used to identify the engine installation losses for flight into known icing conditions, in particular if the engine is also equipped with its own screen.

[Amdt 27/10]

EXHAUST SYSTEM

CS 27.1121 General

For each exhaust system:

(a) There must be means for thermal expansion of manifolds and pipes;

(b) There must be means to prevent local hot spots;

(c) Exhaust gases must discharge clear of the engine air intake, fuel system components, and drains;

(d) Each exhaust system part with a surface hot enough to ignite flammable fluids or vapours must be located or shielded so that leakage from any system carrying flammable fluids or vapours will not result in a fire caused by impingement of the fluids or vapours on any part of the exhaust system including shields for the exhaust system;

(e) Exhaust gases may not impair pilot vision at night due to glare;

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.