EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-27

Small Rotorcraft

Amendment 10; corrected 15 September 2025 Source checked 2026-11-28

Scope, source and reading notes

Complete official CS-27 Amendment 10, including AMC, GM and appendices.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae

Source page 172 · PDF page 172

CS 27.965(d) deals with fuel tank vibration & slosh testing with large unsupported or unstiffened flat areas. A clear definition of ‘large unsupported or unstiffened flat area’ is provided in FAA AC 27-1B, § AC 27.965.

The intent of the tests required in sub-paragraphs (a), (b) or (c) does not cover the intent of the test required in sub-paragraph (d) and vice versa.

Therefore, pressure tests, as prescribed under (a), (b) or (c), and the vibration and slosh test, as prescribed under (d), should be performed.

(b) Use of MIL-T-6396

AC 27.965 (b)(2)(v) recognises the use of MIL-T-6396 to support the demonstration of compliance with CS 27.965. However, few clarifications are required to appropriately make use of this standard.

Combined tests

To be in line with the CS 27.965(d) requirement, the slosh and vibration test conditions shall be simultaneously applied to the test article.

Therefore, the use of MIL-T-6396 should be restricted to paragraph 4.6.6 ‘Simultaneous Slosh and Vibration test’. Individual/separate performance of paragraph 4.6.7 ‘Vibration test’ and paragraph 4.6.8 ‘Slosh Test’ of the referenced MIL Specification are not considered to be appropriate.

Application of the slosh effect during the test as specified in CS 27.965(d)(5):

CS 27.965(d)(5) prescribes the performance of the vibration test for 25h at 16 to 20 slosh cycles per minute (cpm).

MIL-T-6396 proposes two test durations in paragraph 4.6.6:

— Option 1: Vibrate for 25h at 16 to 20 slosh cpm, which is identical to the CS 27.965(d)(5) requirement.

or

— Option 2: Vibrate for 25h at 10 to 16 slosh cpm with 15 hours of additional test at 10 to 16 slosh cpm.

While it is recognised that Option 2 is appropriate in terms of number of cycles to which the test article is finally submitted (extended testing duration to compensate for the reduction of rocking frequency), it potentially omits a major effect introduced by the higher rocking frequency which may induce more severe structural effects due to the fluid dynamics and subsequent shocks.

An applicant wishing to use Option 2 should demonstrate by analysis, test or a combination thereof, that the reduction of rocking frequency compared to Option 1 has no positive effect to the test results.

[Amdt 27/10]

CS 27.967 Fuel tank installation

(a) Each fuel tank must be supported so that tank loads are not concentrated on unsupported tank surfaces. In addition:

(1) There must be pads, if necessary, to prevent chafing between each tank and its supports;

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.