CS-27
Small Rotorcraft
Amendment 10; corrected 15 September 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-27 Amendment 10, including AMC, GM and appendices.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae
(i) The maximum value determined by the rotor design; or
(ii) The maximum value demonstrated during the type tests;
(2) The maximum allowable gas temperature; and
(3) The maximum allowable torque.
(i) Continuous OEI power operation. Unless otherwise authorised, the use of continuous OEI power must be limited to multi-engine, turbine-powered rotorcraft for continued flight after failure of an engine. The use of continuous OEI power must also be limited by:
(1) The maximum rotational speed, which may not be greater than –
(i) The maximum value determined by the rotor design; or
(ii) The maximum value demonstrated during the type tests;
(2) The maximum allowable gas temperature; and
(3) The maximum allowable torque.
(j) Rated 30-second OEI power operation. Rated 30-second OEI power is permitted only on multi- engine, turbine-powered rotorcraft, also certificated for the use of rated 2-minute OEI power, and can only be used for continued operation of the remaining engine(s) after a failure or precautionary shutdown of an engine. It must be shown that following application of 30-second OEI power, any damage will be readily detectable by the applicable inspections and other related procedures furnished in accordance with paragraph A27.4 of Appendix A of this CS-27. The use of 30-second OEI power must be limited to not more than 30 seconds for any period in which that power is used, and by:
(1) The maximum rotational speed which may not be greater than:
(i) The maximum value determined by the rotor design: or
(ii) The maximum value demonstrated during the type tests:
(2) The maximum allowable gas temperature; and
(3) The maximum allowable torque.
(k) Rated 2-minute OEI power operation. Rated 2-minute OEI power is permitted only on multi- engine, turbine-powered rotorcraft, also certificated for the use of rated 30-second OEI power, and can only be used for continued operation of the remaining engine(s) after a failure or precautionary shutdown of an engine. It must be shown that following application of 2-minute OEI power, any damage will be readily detectable by the applicable inspections and other related procedures furnished in accordance with A27.4 of appendix A of this CS-27. The use of 2-minute OEI power must be limited to not more than 2 minutes for any period in which that power is used, and by:
(1) The maximum rotational speed, which may not be greater than:
(i) The maximum value determined by the rotor design; or
(ii) The maximum value demonstrated during the type tests;
(2) The maximum allowable gas temperature; and
(3) The maximum allowable torque.
[Amdt 27/3]
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source