CS-27
Small Rotorcraft
Amendment 10; corrected 15 September 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-27 Amendment 10, including AMC, GM and appendices.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae
applicant should consider that the continued validity of these assumptions is typically linked to an appropriate TBO. As a result, the validation of these assumptions and the development of the TBO are processes that should be progressed in parallel after entry into service (EIS).
The final and mature TBO should normally be based on the results of investigations from in-service aircraft, overhauled gearboxes and data acquired during development, certification, and maturity tests substantiating the reliability of the parts and their capability to operate safely. However, until this data becomes available, the applicant should maintain a conservative TBO, extending it throughout the life of the product as positive supporting data from service becomes available.
(2) Guidance
For drive system gearboxes that are essential to drive the rotors, EASA considers that the initial TBO at EIS and the plan to increase it in service should be justified. For this purpose, the following should be considered by the applicant:
— Initial TBO (applicable at EIS)
At EIS, the available data supporting the justification of the TBO of a rotor drive system gearbox is typically limited. The applicant should, therefore, propose a conservative initial TBO supported by the data coming from:
— the endurance test,
— flight tests,
— other relevant tests, and
— experience on similar design having the same characteristics.
The applicant should take into account that, in general, only limited experience of the real operating environment and conditions for a new gearbox is available at EIS.
This initial TBO should ensure enough opportunities to verify the condition of internal gearbox components in order to validate the assumptions made at the time of certification, preventing that any compromised assumption may lead to an in-service catastrophic or hazardous failure.
— TBO step increase
The increase of a gearbox TBO in service should be accomplished in steps providing confidence progressively in the validity of the certification assumptions. Each TBO step increase should:
— only be proposed when the current TBO is supported by a sufficient
number of gearbox overhaul inspection results;
— be based on a sufficient number of gearboxes from the fleet to be
inspected, and take into account the representativeness of operational and environmental aspects of the selected samples to represent the full spectrum of gearbox usage;
— be based on technical justifications from overhauled gearboxes (e.g.
condition of inspected parts, evidence from similar designs, etc.), maturity testing and in-service feedback (incidents, health and usage monitoring system (HUMS) data, etc.); and
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source