EASA Certification Specifications with AMC/GMFinal — current published edition checked

CS-27

Small Rotorcraft

Amendment 10; corrected 15 September 2025 Source checked 2026-11-28

Scope, source and reading notes

Complete official CS-27 Amendment 10, including AMC, GM and appendices.

Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae

Source page 198 · PDF page 198

(c) The applicant should describe the intended function(s) and associated task(s) for:

(1) each design item affected by the modification and its integration;

(2) crew indications and controls for that equipment; and

(3) the prominent characteristics of those indications and controls.

This type of information is of the level typically provided in a pilot handbook or an operations manual. It would describe the indications, controls, and crew member procedures.

(d) The applicant may evaluate whether the statement of the intended function(s) and the associated task(s) is sufficiently specific and detailed by using the following questions:

(1) Does each design item have a stated intent?

(2) Are the crew member tasks associated with the function(s) described?

(3) What assessments, decisions, and actions are crew members expected to make based on the information provided by the system?

(4) What other information is assumed to be used in combination with the system?

(5) Will the installation or use of the system interfere with the ability of the crew members to operate other cockpit systems?

(6) Are any assumptions made about the operational environment in which the equipment will be used?

(7) What assumptions are made about the attributes or abilities of the crew members beyond those required in the regulations governing operations, training, or qualification?

(e) The output of this step is a list of design items, with each of the associated intended functions that has been related to the crew member tasks.

3.2.3 Determining the level of scrutiny

(a) The depth and extent of the HFs investigation to be performed in order to demonstrate compliance with CS 27.1302 is driven by the level of scrutiny.

The level of scrutiny is determined by analysing the design items using the criteria described in the following subparagraph:

(1) Integration. The level of the systems’ integration refers to the extent to which there are interdependencies between the systems that affect the operation of the rotorcraft by the crew members. The applicant should describe the integration between systems because it may affect the means of compliance. Paragraph 4.6 also refers to integration. In the context of that paragraph, ‘integration’ defines how specific systems are integrated into the cockpit and how the level of integration may affect the means of compliance.

(2) Complexity. The level of complexity of the system design from the crew members’ perspective is an important factor that may also affect

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

CS-27 and AC 27-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.