CS-27
Small Rotorcraft
Amendment 10; corrected 15 September 2025 Source checked 2026-11-28
Scope, source and reading notes
Complete official CS-27 Amendment 10, including AMC, GM and appendices.
Aerospace Consulting reference note: Certification specifications and related compliance guidance for small rotorcraft, using the corrected official publication.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: EASA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: e762c494818f5badf2cceb0a8dc04e8cf5938efa2552deeadc0f708d1ead92ae
(1) The approval of an external loads equipment design in accordance with CS 27.865 does not provide an approval to conduct external loads operations. Therefore, the following should be included as a limitation in the RFM or RFMS:
— The external load equipment certification approval does not
constitute an operational approval; an operational approval for external load operations must be granted by the competent authority.
(2) The RFM or RFMS that will be approved through the certification activity should not contain any references to the previously used RLC classes.
(B) For non-HEC designs, the following limitation should be included within the RFM or RFMS:
— The external load system does not comply with the CS-27 certification
provisions for Human External Cargo (HEC).
(C) The RFM or RFMS may contain suitable text to clarify whether the external load system meets the applicable certification provisions for lifting an external load free of land or water, and whether the load is jettisonable.
(D) The RFM or RFMS should contain emergency procedures detailing the steps to be taken by the flight crew during emergencies such as an engine failure, hoist failure, flight director or autopilot failure, etc.
(E) The RFM or RFMS normal procedures should explain the required procedures to conduct a safe external load operation. Such information may include the methods for attachment and normal release of the external load.
(ii) HEC installations.
(A) For HEC installations, the following additional information/limitation should be included in the RFM or RFMS:
(1) That the external load system meets the CS-27 certification specifications for Human External Cargo (HEC).
(2) Operation of the external load equipment with HEC requires the use of an approved Personnel Carrying Device Systems (PCDS).
NOTE: for a simple PCDS, also refer to AMC No. 3 to 27.865
(B) Crew member communications.
(1) The flight manual should clearly define the method of communication between the flight crew and the HEC. These instructions and manuals should be validated during flight testing.
(2) If the external load system does not include equipment to allow direct intercommunication among required crew members and external occupants, the following limitation may be included within the limitations section of the RFM or RFMS:
— This external load system does not include equipment to allow
direct intercommunication among required crew members and external occupants. Operating this external load equipment with
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
CS-27 and AC 27-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source