FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 323 · PDF page 323

aCRIT is used to set the inspection interval. This general process applies to both single and multiple load path structure regardless of the level of inspection (e.g., for complete load path failure or less than load path failure in a multiple load path structure). The details of defining the interval once the crack growth life has been determined are discussed later.

(A) Single Load Path Structure. The time for a detectable crack (aDET) to grow to critical size (aCRIT) in a structure is denoted as L2 in Figure AC 29.571B-4. If this were a single load path structure, the inspection interval would be established as L2 divided by N. (See paragraph f.(8)(ii)(C) for guidance on values of N.) This interval is valid until the part is retired.

(B) Multiple Element Structure.

(1) Depending on inspectability considerations and residual life characteristics of the structure following a load path failure, it may be beneficial to take advantage of the redundancy of a multiple load path structure. On the other hand, the safety of a multiple load path structure can be managed without taking advantage of its redundancy. In this case, each load path would be considered independently and inspection intervals established for each load path consistent with paragraph f.(8)(ii)(A). This may be necessary for similarly stressed load paths when damage according to the threat assessment could occur in each element at the same time.

(2) When considering redundancy in a multiple load path structure, two scenarios might be possible; one where the required inspection is for a completely failed load path and one where the inspection is for less than a load path failure. In either case, the remaining life of the secondary load path after primary load path failure is used to determine the inspection interval. Consistent with this, the resulting intervals are only valid until the cumulative fatigue damage or crack growth in the intact structure is taken into account. This issue is illustrated in a crack growth context in Figure AC 29.571B-5. Crack growth in the secondary load path from an initial crack as detailed in paragraph f.(8)(ii)(B)(3)(i) will proceed along curve A-B as long as the primary load path remains intact and load redistribution is negligible. However, at the time of primary load path failure, loading on the secondary load path will increase due to load redistribution and crack growth will be accelerated (e.g., subsequent growth from point 1, 2, or 3 depending on if the failure occurs at time t1, t2 or t3). Note that the residual life, Lr, in the secondary load path is inversely proportional to the time at which primary load path failure occurs. This should be considered whenever Lr is used in establishing repeat inspection intervals.

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.