AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
SUBPART F - EQUIPMENT
ELECTRICAL SYSTEMS AND EQUIPMENT
AC 29.1351. § 29.1351 (Amendment 29-40) ELECTRICAL SYSTEMS AND EQUIPMENT -GENERAL.
a. Explanation. With the advent of more sophisticated rotorcraft and operations under more critical conditions, such as IFR and icing, it is essential that the electrical system be very carefully analyzed and evaluated to assure proper operation under any foreseeable operating condition, and that hazards do not result from any malfunctions or failures.
b. Procedures.
(1) An acceptable method of preparing an electrical load analysis is given in Military Specification MIL-E-7016F, and use of this standard is preferred since it has received widespread acceptance. If other formats have been used and have been considered acceptable, their continued use is acceptable.
(2) Generating systems must be analyzed, inspected, or tested to assure conformance to the following criteria. Analysis should be performed on the electrical power system emphasizing the exclusion of single point failures and possibilities of latent failures. Test methods should be developed that uncover latent faults. Ref MG-2 for electrical system test methods.
(i) Analyses should be performed on the electrical power system with an emphasis on excluding single point and latent failures. Also, evaluate the non- monitored functions by selecting test conditions that use every signal path and decision point between the input and output. Test methods should be developed that uncover latent faults. Refer to MG-2 for electrical system test methods.
(ii) For Category A, the generating system must perform as specified in § 29.1309(d) and (e).
(iii) No probable malfunction in the generating system or in the generator drive system may result in loss of service to electric utilization systems which are necessary to maintain controlled flight and to affect a safe landing, unless the aircraft is equipped with an independent source of electrical power capable of supplying continuous emergency service to these utilization systems. A probable malfunction is any single electrical or mechanical component malfunction or failure that is likely to occur based on past service experience. This past service experience can include malfunction of components of previously approved rotorcraft, other aircraft, or qualitative analysis of similar components in rotorcraft applications. These analyses should be extended to multiple malfunctions when:
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source