AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
Primary Load Path Failure
Lr1 Lr2 Lr3
Primary Load Path Crack Growth
CRACK SIZE
_____ .... ---· -------
.... -· ....... --- _________ .,.
........ ---·-· _ ..... -----·-·-· .... -•-· ·-------------- --------·--------------------------
B
Secondary Load Path Crack Growth - Intact Structure
1 2 3
A
----- )t_ --- ----------
t1 t2 t3 CRACK GROWTH LIFE
Figure AC 29.571B-5: Decreasing Residual Life in Secondary Load Path for Multiple Element Crack Growth with Inspections.
(3) Inspect for Load Path Failure. If a failed load path is easily detectable and the residual life and strength of the remaining structure is sufficient, this approach may be optimum. Analysis or tests as described in the following paragraphs can determine the inspection interval.
(i) Evaluation by analysis. Figure AC 29.571B-6 illustrates an example of multiple load path structure for which a completely failed load path is easily detectable. The inspection interval is based on the life of the secondary load path (Lr) after primary load path failure at time NF. Consistent with this, damage accumulated in the secondary load path prior to primary load path failure must be accounted for in the analysis. In order to do this within the context of a crack growth analysis, it is necessary to assume some initial crack, of size ai, exists in the secondary load path at time zero. This initial crack size should be representative of a normal manufacturing quality unless the threat assessment indicates that larger damage could exist. Crack growth accumulated prior to a load path failure is accounted for by calculating the amount of growth, (Δai), between time zero and NF. Load redistribution that may occur prior to NF should be considered. The residual life, (Lr), then becomes the time for a crack of size ai + Δai to grow to critical size, assuming a complete load path failure has occurred (i.e., “failed” condition loads used). It should be noted that the assumed time of load path failure would also represent an upper limit of validity for any repeat inspection period based on Lr. It is therefore recommended that NF be assumed equal to the retirement
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source