AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
time for the structure being inspected or the rotorcraft design life if the structure has no declared retirement time. Based on the above,
(A) Inspection Interval = Lr/N [For N refer to paragraph f.(8)(ii)(C)].
(B) Limit of validity = NF (i.e., repetitive inspection time would not be valid for operation beyond NF).
Primacy Load Failure
..
~ Secondacy Path Failure Limit
CRACK GROWIB
Figure AC 29.571B-6: Multiple Load Path Structure Analytical Evaluation to Support Inspection for a Failed Load Path.
(ii) Evaluation by Test. Figure AC 29.571B-7 illustrates some key points if an inspection for a complete load path failure is to be developed based on testing. The inspection interval is based on the test demonstrated residual life (Lr) subsequent to load path failure. Because the residual life decreases with the time accumulated prior to a load path failure, there will be a limit of validity to the Lr and it will be dependent on the time at which a load path failure is simulated, (ND).
(A) The test article should consist of as-manufactured production parts. Representative “well” condition loading should be applied for some
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source