FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 327 · PDF page 327

Primary Load Path Intentionally Disabled

''Failed" Condition Loading

~ u

Secondary Load Path Not Capable of Limit Load

< ~ U "Well" Condition --------------------------. ~ Loading

IN

TEST

Figure AC 29.571B-7: Multiple Load Path Structure Evaluation by Test to Support Inspection for a Failed Load Path.

(4) Inspect for Less Than a Load Path Failure. Inspection for less than a load path failure may require special non-destructive Inspection (NDI) procedures but will result in longer inspection intervals. Figure AC 29.571B-8 illustrates how inspection intervals could be established on the basis of crack growth and residual strength evaluation.

(i) In this case, the inspection interval is based on the life of the secondary load path (Lr) subsequent to primary load path failure at NF plus the time (LP) for a detectable crack (aDET) in the primary load path to grow to critical size under in-service loads. The determination of Lr is the same as discussed in paragraph f.(8)(ii)(B)(3)(i).

(ii) Based on the above,

(A) Repetitive Inspection = (LP + Lr)/N [For N refer to paragraph f.(8)(ii)(C)].

(B) Limit of validity = NF.

View figures, tables and original page layoutOriginal source page Source page 327 · PDF page 327 of AC 29-2C

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.