FAA Advisory circularActive

AC 29-2C

Certification of Transport Category Rotorcraft

29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28

Scope, source and reading notes

Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.

Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013

Source page 314 · PDF page 314

probable damage from any source that would lead to failure of the part in less time that it would take the BEC to reach critical size. Each applicant must justify the BEC sizes used in the analysis; however, there has been some limited experience that indicates that the following BEC sizes could be appropriate.

(1) 0.015 inch or 0.380 mm radius semicircular surface crack for precision-machined mechanical parts

(2) 0.050 inch or 1.270 mm radius quarter-circular corner crack in fastener holes for typical aluminum airframe structure

(F) Initial Inspectable Crack. The size and shape of the initial inspectable crack (aDET) must be established when the Crack Growth Inspection approach is used. The inspection interval is based on the time for the initial inspectable crack to grow to a size (aCRIT) that would result in catastrophic failure of the rotorcraft if limit loads were applied. The initial inspectable crack is a function of the inspection method that is used to detect it. Regardless of the inspection method, the probability of detecting this size crack should be high and it should be substantiated.

(6) Inspectability and Inspection Methods. This section provides guidance on selecting and substantiating damage detection methodology for use with the methods of paragraphs f.(8) (Inspection Intervals) and f.(10) (Approved Equivalent Means). The methods of paragraph f.(8) can result in a mandated inspection program that must be included in the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness in accordance with § 29.1529 of the regulatory requirements. Qualified personnel must conduct these inspections at the specified interval using the approved method or methods. Additionally, § 29.571 allows that substantiation may be accomplished by “Approved Equivalent Means,” which is discussed in paragraph f.(10). These Approved Equivalent Means may include actions that detect damage or flaws indirectly, and are substantiated using the methods of paragraph f.(8). These actions should be shown to be reliable and systematically conducted by knowledgeable personnel. The following are considerations for establishing inspections, inspection methods, or indirect damage detection.

(i) Inspectability. The ease of conducting an inspection should be a design goal for principal structural elements. Design features such as open construction, access panels or ports, or other easy access to fatigue critical areas for needed inspections should be considered. A design that requires disassembly in order to conduct a required inspection, other than during a scheduled maintenance disassembly, should be avoided.

(ii) The specific inspection methods that are used to accomplish fatigue substantiation should be:

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

AC 27-1B

Related technical context

Engineering context
Evidence and scope

AC 27-1B and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source
CS-29

Related technical context

Engineering context
Evidence and scope

CS-29 and AC 29-2C — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.