AC 29-2C
Certification of Transport Category Rotorcraft
29-2C — Changes 1–9 incorporated (2023-06-23) Source checked 2026-11-28
Scope, source and reading notes
Transport category rotorcraft certification guidance under Part 29; consolidated FAA publication incorporating Changes 1 through 9. Base publication catalog date: 2008-09-30; latest included change: 2023-06-23.
Aerospace Consulting reference note: Broad Part 29 guidance covering transport rotorcraft design, flight, equipment, systems, and certification, including system safety and flight guidance.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: c57691386dd1e59263633bd8fdaabb842a958061a9b6a82d30dad18358977013
(B) Assess the handling qualities with the autopilot coupled. If a 4-axis autopilot is proposed, then evaluate the loss of each axis on approach procedures and aircraft handling characteristics.
(C) Assess the transition from coupled instrument flight to uncoupled visual flight at the Decision Altitude (DA).
(a) Accomplish the continuation of the approach in the visual mode to assess the workload required to slow the aircraft at a point to make a landing.
(b) For rotorcraft with Category A procedures, ensure the aircraft can slow to the appropriate speed by the designated landing decision point from the DA.
(ix) If not evaluating the steep angle approaches for IFR aircraft, then a limitation should be added to the rotorcraft flight manual or rotorcraft flight manual supplement limiting IFR coupled RNAV approach operations to a maximum glidepath angle of 3.5° and the minimum approach airspeed that meet flight manual limitations. This is necessary until evaluations are accomplished and the determination is made that the autopilot-GPS integration supports steep-angle, low speed operations.
(2) Failure mode evaluations:
(i) Evaluate the loss of SBAS and all flight director or vertical guidance display behavior during all phases of operation.
(A) Indications of failure of the SBAS or loss of vertical guidance should be clear and unambiguous to the pilot.
(B) The pilot should be able to transition to degraded approach procedures without undue concentration or exceptional skill.
(ii) Evaluate misleading guidance information. Evaluate performance of advisory vertical guidance provided for LNAV approaches when provided in accordance with AC 20-138 (current version) guidance.
(19) Rotorcraft Condition Monitoring System Installations.
(i) General. Avionics equipment and systems are being installed in rotorcraft to collect data for use in assessing engine and rotorcraft performance and frequency of maintenance. Some of the items monitored are engine operating exceedances, hot starts, power assurance, and cycle counts. The monitoring systems addressed by this paragraph are those used to collect data for maintenance purposes and not those used in autopilot, flight control, or engine control systems. At present, optional approvals are being requested for most of these systems not performing any required functions. However, most of the applicants anticipate requesting approval for the systems to be
Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Related technical context
Engineering contextEvidence and scope
AC 27-1B and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
CS-29 and AC 29-2C — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source