AC 25.1309-1B
System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
AC 25.1309-1B Appendix F
F.4 Calculation of the “Probability per Flight” of a Failure Condition over a period of N flights. The next step is to calculate the probability per flight for the failure condition. In other words, the probability of the failure condition for each flight (which might be different although all flights are average flights) during the relevant time (for example, the least common multiple of the exposure times or the airplane life) should be calculated, summed up, and divided by the number of flights during that period. The principles of calculating are described below and in more detail in SAE ARP 4761.
F.4.1.1 The element is checked operative at the beginning of the certain flight, Then:
∑𝑁𝑁 𝑘𝑘=1 𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 𝑘𝑘(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 𝑘𝑘) 𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) = 𝑁𝑁
F.4.1.2 The state of the single element is unknown at the beginning of the certain flight.
Then: ∑𝑁𝑁 𝑘𝑘=1 𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 𝑘𝑘(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 𝑘𝑘) 𝑓𝑓𝑖𝑖 𝑓𝑓𝑒𝑒𝑓𝑓𝑓𝑓𝑓𝑓 𝑡𝑡𝑜𝑜 𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑏𝑏𝑏𝑏 𝑓𝑓𝑒𝑒𝑑𝑑 𝑜𝑜𝑓𝑓 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) = 𝑃𝑃𝑝𝑝𝑝𝑝𝑓𝑓𝑝𝑝𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑒𝑒𝑓𝑓𝑓𝑓𝑜𝑜𝑓𝑓 𝑡𝑡𝑜𝑜 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) + 𝑃𝑃𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡)
𝑛𝑛 𝑡𝑡𝑖𝑖 = 𝑃𝑃𝑝𝑝𝑝𝑝𝑓𝑓𝑝𝑝𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑒𝑒𝑓𝑓𝑓𝑓𝑜𝑜𝑓𝑓 𝑡𝑡𝑜𝑜 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) + ቀ1 −𝑃𝑃𝑝𝑝𝑝𝑝𝑓𝑓𝑝𝑝𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑒𝑒𝑓𝑓𝑓𝑓𝑜𝑜𝑓𝑓 𝑡𝑡𝑜𝑜 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡)ቁ∗ቌ1 −ෑ𝑓𝑓𝑒𝑒𝑒𝑒ቆ−න 𝜆𝜆𝑓𝑓(𝑒𝑒)𝑑𝑑𝑒𝑒ቇቍ 𝑡𝑡 𝑓𝑓=1 𝑖𝑖−1
Thus: 𝑃𝑃𝑝𝑝𝑎𝑎𝑝𝑝 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) =
𝑃𝑃𝑝𝑝𝑝𝑝𝑓𝑓𝑝𝑝𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑒𝑒𝑓𝑓𝑓𝑓𝑜𝑜𝑓𝑓 𝑡𝑡𝑜𝑜 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) + ቀ1 −𝑃𝑃𝑝𝑝𝑝𝑝𝑓𝑓𝑝𝑝𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑒𝑒𝑓𝑓𝑓𝑓𝑜𝑜𝑓𝑓 𝑡𝑡𝑜𝑜 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡)ቁ∗൬1 −∏𝑛𝑛 𝑓𝑓=1 𝑓𝑓𝑒𝑒𝑒𝑒ቀ− 𝑡𝑡 ∫𝑖𝑖𝜆𝜆𝑓𝑓(𝑒𝑒)𝑑𝑑𝑒𝑒ቁ൰ 𝑡𝑡𝑖𝑖−1 𝑁𝑁
Where N is the quantity of all flights during the relevant time, and Pflight k is the probability that the failure condition occurs in flight k.
F.5 Calculation of the “Average Probability per Flight Hour” of a Failure Condition. Once the average probability per flight has been calculated, it should be normalized by dividing it by the average flight duration TF in flight hours to obtain the average probability per flight hour. This quantitative value should be used in conjunction with the hazard category/effect established by the FHA to determine if it is compliant for the failure condition being analyzed.
𝑃𝑃 (𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒 𝑓𝑓𝑒𝑒 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡) 𝑃𝑃𝑎𝑎𝑎𝑎𝑎𝑎𝑝𝑝𝑎𝑎𝑓𝑓𝑎𝑎 𝑝𝑝𝑎𝑎𝑝𝑝 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 ℎ𝑝𝑝𝑜𝑜𝑝𝑝(𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑜𝑜𝑒𝑒𝑑𝑑𝑓𝑓𝑡𝑡𝑓𝑓𝑜𝑜𝑒𝑒) = 𝑝𝑝𝑎𝑎𝑝𝑝 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓ℎ𝑡𝑡 𝑇𝑇𝐹𝐹
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source