Scope, source and reading notes

Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.

Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92

Source page 29 · PDF page 29

5.3.1.1 Possible failure conditions and their causes, modes of failure, and damage from sources external to the system.

5.3.1.2 The possibility of multiple failures due to a common cause, multiple independent failures, and undetected failures.

5.3.1.3 The possibility of requirement, design, and implementation errors.

5.3.1.4 The effect of flightcrew errors reasonably expected in service after the occurrence of a failure or failure condition. (See AC 25.1302-1.)

5.3.1.5 The effect of reasonably anticipated errors when performing maintenance actions.

5.3.1.6 The flightcrew alerting cues, corrective action required, and the flightcrew capability of detecting faults.

5.3.1.7 The resulting effects on the airplane and its occupants, or other persons (such as ground crew or maintenance personnel), considering the stage of flight, the operational sequences (sequence of system responses or expected flightcrew actions following a failure(s)), and operating and environmental conditions.

5.3.2 Planning. This AC provides guidance on methods of accomplishing the safety objective. The detailed methodology needed to achieve this safety objective depends on many factors, particularly, the degree of system complexity and integration. For proposed airplane designs that will contain many complex or integrated systems, it is likely that the applicant will need to propose and develop a plan to describe the intended process. In general, the extent and structure of the analyses to show compliance with § 25.1309 will be greater when the system is more complex, and the effects of the failure conditions are more severe. Industry standards such as those listed in paragraph 1.4.5 of this AC provide further information on the planning activity. This plan should include consideration of all of the following aspects:

5.3.2.1 Functional and physical interrelationships of systems.

5.3.2.2 Determination of detailed means of compliance, which may include the use of development assurance techniques.

5.3.2.3 Means for establishing the accomplishment of the plan, including how the plan is followed throughout the project to ensure completion.

5.3.3 Availability of Industry Standards and Guidance Materials. There are a variety of acceptable techniques used currently in industry, some of which are reflected in SAE ARP 4754 and ARP 4761. This AC is not intended to constrain the applicant to the use of these documents in defining their particular methods for

View figures, tables and original page layoutOriginal source page Source page 29 · PDF page 29 of AC 25.1309-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

14 CFR 25.1309

Provides compliance guidance for

Source-backed
Evidence and scope

FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Assess against the applicable project amendment; current source and certification basis are distinct.

Supporting source
ARP4754 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.

Supporting source
ARP4761 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.

Supporting source
AC 20-174

References development-assurance guidance

Source-backed
Evidence and scope

FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30

References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.

Read the cited document’s applicability and the project certification basis.

Supporting source
AMC 25.1309

Related EASA safety guidance

Engineering context
Evidence and scope

FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Harmonised terms do not establish whole-document equivalence.

Supporting source
AC 20-152A

References hardware guidance

Source-backed
Evidence and scope

AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30

Identifies AC 20-152A as hardware development-assurance guidance.

Read the source scope and applicable project basis.

Supporting source
AC 23.1309-1E

Related technical context

Engineering context
Evidence and scope

AC 23.1309-1E and AC 25.1309-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.

This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.

Supporting source

Copy reference

Select and copy the citation below.