AC 25.1309-1B
System Design and Analysis
25.1309-1B · 2024-08-30 Source checked 2026-11-28
Scope, source and reading notes
Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.
Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.
The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.
Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.
Official source recordOriginal PDF on this siteSource: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92
AC 25.1309-1B Appendix C
APPENDIX C. OVERVIEW OF THE SAFETY ASSESSMENT PROCESS
C.1 Purpose. In showing compliance with § 25.1309(b), the applicant should address the considerations covered in this AC in a methodical and systematic manner, which ensures that the process and its findings are visible and readily assimilated into compliance-showing documents. The FAA has provided this appendix primarily for applicants who are unfamiliar with the various methods and procedures typically used in the industry to conduct safety assessments. This guide and figures C-1 and C-2 are not certification checklists, and they do not include all the information provided in this AC. There is no necessity for an applicant to use them or for the FAA to accept them, in whole or in part, to show compliance with any regulation. The sole purpose of this guidance is to assist applicants by illustrating a systematic approach to safety assessments, to enhance understanding and communication by summarizing some of the information provided in this AC, and to provide some suggestions on documentation. You can find more detailed guidance in SAE ARP 4761. SAE ARP 4754 includes additional guidance on how the safety assessment process relates to the system development process.
C.2 Safety Assessment Process.
C.2.1 Define the system and its interfaces and identify the functions that the system is to perform. The safety assessment process may identify additional safety requirements for the functions during the system development life cycle.
C.2.2 Determine whether the system is complex, similar to systems used on other airplanes, or conventional. Where multiple systems and functions should be evaluated, consider the relationships between multiple safety assessments.
C.2.3 Identify and classify failure conditions. All relevant applicant engineering organizations, such as systems, structures, propulsion, and flight test, should be involved in this process. This identification and classification may be done by conducting an FHA, which is usually based on one of the following methods, as appropriate:
C.2.3.1 If the system is not complex and its relevant attributes are similar to those of systems used on other airplanes, the identification and classification may be derived from design and installation appraisals and the service experience of the comparable, previously approved systems.
C.2.3.2 If the system is complex, it is necessary to postulate systematically the effects on the safety of the airplane and its occupants resulting from any possible failures, considered both individually and in combination with other failures or events.
View figures, tables and original page layout

Connected references
Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.
Provides compliance guidance for
Source-backedEvidence and scope
FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Assess against the applicable project amendment; current source and certification basis are distinct.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.
Supporting sourceReferences latest version
Source-backedEvidence and scope
FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13
Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.
Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.
Supporting sourceReferences development-assurance guidance
Source-backedEvidence and scope
FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30
References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.
Read the cited document’s applicability and the project certification basis.
Supporting sourceRelated EASA safety guidance
Engineering contextEvidence and scope
FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53
Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.
Harmonised terms do not establish whole-document equivalence.
Supporting sourceReferences hardware guidance
Source-backedEvidence and scope
AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30
Identifies AC 20-152A as hardware development-assurance guidance.
Read the source scope and applicable project basis.
Supporting sourceRelated technical context
Engineering contextEvidence and scope
AC 23.1309-1E and AC 25.1309-1B — published scope
Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.
This connection does not establish regulatory equivalence, acceptance of a newer edition, or applicability of a project-specific precedent to another programme.
Supporting source