AC 25.1309-1B

System Design and Analysis

25.1309-1B · 2024-08-30 Source checked 2026-11-28

Scope, source and reading notes

Guidance for showing compliance with §25.1309. Confirm the applicable amendment level and accepted means for the programme.

Aerospace Consulting reference note: A starting point for transport-airplane system-safety assessment and development-assurance connections.

The complete selected publication is available in reading text and as the original PDF. Reading text is extracted from the official PDF; page layout is simplified, and figures and tables should be checked in the original page view.

Search covers extracted text. Words contained only in graphics may not be searchable. The original publication is available below.

Official source recordOriginal PDF on this site

Source: FAA. Reproduced with source acknowledgment; source edition and status are shown above. SHA-256: 90e625593d472b74ec69fbcefe97649f97794410dbe844f7684b397121ac5a92

Source page 70 · PDF page 70

AC 25.1309-1B Appendix F

APPENDIX F. CALCULATING THE “AVERAGE PROBABILITY PER FLIGHT HOUR”

F.1 Purpose. This appendix provides applicants with guidance for calculating the “average probability per flight hour” for a failure condition, so it can be compared with the quantitative criteria in this AC. (As discussed in paragraph 7.6.1.4, for failure conditions and associated classifications that are only relevant during a specific flight phase, evaluate the average risk under those specific conditions rather than allowing the risk to be averaged out over a flight of mean duration. For these cases, the probability is calculated as an average probability per flight. To convert to “average probability per flight hour”, divide the per flight probability by one hour.) The process of calculating the “average probability per flight hour” for a failure condition is described here as a four step process and is based on the assumption that the life of an airplane is a sequence of average flights:

• Step 1: Determine the average flight.

• Step 2: Calculate the probability of a failure condition for a certain average flight.

• Step 3: Calculate the average probability per flight of a failure condition.

• Step 4: Calculate the average probability per flight hour of a failure condition.

F.2 Determining the “Average Flight.” The “average probability per flight hour” is based on an average flight. The applicant should estimate the average flight duration and average flight profile for the airplane fleet to be certified. The average flight duration should be estimated based on the applicant’s expectations and historical experience for similar types. The average flight duration should reflect the applicant’s best and latest estimate of the cumulative flight hours divided by the cumulative airplane flights for the service life of the airplane. The average flight profile should be based on the operating weight and performance expectations for the average airplane when flying a flight of average duration in an International Civil Aviation Organization standard atmosphere. The duration of each flight phase (for example, takeoff, climb, cruise, descent, approach, and landing) in the average flight should be based on the average flight profile. Average taxi times for departure and arrival at an airport should be considered where appropriate and added to the average flight time. The average flight duration and profile should be used as the basis for determining the average probability per flight hour for a quantitative safety assessment. Note that to meet 14 CFR Appendix K to Part 25, K25.1 ETOPS design requirements, the consideration for maximum flight duration with the longest diversion time should be used when showing compliance with § 25.1309(b).

View figures, tables and original page layoutOriginal source page Source page 70 · PDF page 70 of AC 25.1309-1B

Connected references

Source-backed citations and subject-based engineering context are labelled separately. These links do not establish equivalence or project acceptance.

14 CFR 25.1309

Provides compliance guidance for

Source-backed
Evidence and scope

FAA AC 25.1309-1B Cover and §1.1, printed p1-1 / PDF p6; FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Provides acceptable means for compliance with 14 CFR 25.1309. Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Assess against the applicable project amendment; current source and certification basis are distinct.

Supporting source
ARP4754 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-B citation; preserve family reference and latest-version instruction.

Supporting source
ARP4761 document family

References latest version

Source-backed
Evidence and scope

FAA AC 25.1309-1B §1.4.5, printed pp1-7–1-8 / PDF pp12–13

Lists ARP4754 and ARP4761 without revision suffixes and explicitly instructs use of the latest referenced version. Preserve this revision policy rather than pinning the reference to legacy editions.

Do not display this as an explicit suffix-A citation; preserve family reference and latest-version instruction.

Supporting source
AC 20-174

References development-assurance guidance

Source-backed
Evidence and scope

FAA AC 25.1309-1B §5.3.4, printed p5-4 / PDF p30

References AC 20-174 for aircraft/system assurance, AC 20-115D for software and AC 20-152A for hardware.

Read the cited document’s applicability and the project certification basis.

Supporting source
AMC 25.1309

Related EASA safety guidance

Engineering context
Evidence and scope

FAA AC 25.1309-1B Appendix A §A.5, printed pA-3 / PDF p53

Connects the rule change to amendment25-152 and notes harmonisation of failure-condition/probability terms with AMC 25.1309; this is not whole-document equivalence.

Harmonised terms do not establish whole-document equivalence.

Supporting source
AC 20-152A

References hardware guidance

Source-backed
Evidence and scope

AC 25.1309-1B §5.3.4.2, printed p5-4 / PDF p30

Identifies AC 20-152A as hardware development-assurance guidance.

Read the source scope and applicable project basis.

Supporting source
AC 23.1309-1E

Related technical context

Engineering context
Evidence and scope

AC 23.1309-1E and AC 25.1309-1B — published scope

Aerospace Consulting navigation suggestion based on the subject and stated scope of the two publications.